Quick answers
What is this project?
M/s. Smt. Venumuddala Ramadevi, Mining of Gravel over an extent of 1.62 Ha. in Survey No. 321 of Thatikonda village, Ghanpur (Stn) Mandal, Jangaon District is a lapsed mining project in Tadikonda, Ghanpur (Station), Jangoan, Telangana. The site covers 4 acres.
Who is building it?
The applicant is Venumuddala Rama Devi.
Has it been approved?
No. The application was lapsed on 30 Nov 2025, so it is no longer under consideration.
Where is it?
In Tadikonda, Ghanpur (Station), Jangoan, Telangana.
How big is it?
It has a stated cost of ₹25 lakh and a site of 4 acres.
When was it filed?
The application was filed on 30 Oct 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 30 Nov 2025 |
| Application filed | 30 Oct 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Venumuddala Rama Devi |
| Land area | 4 acres (1.6 ha) |
| Project cost | ₹25 lakh |
| Village / locality | Tadikonda |
| Taluk / tehsil | Ghanpur (Station) |
| District | Jangoan |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-01151 |
In context
38 applications in Jangoan since January 2022 are in the same category (Mining): 32 approved, 2 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 4 acres, this one is smaller than 61% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 7 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 3 mining leases have applied within 5 km.
Where it is
Tadikonda, Ghanpur (Station), Jangoan, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- M/s. Smt. Kunduru Usha Reddy, Mining of Gravel over an extent of 1.22 Ha. in… — environmental approval granted, 250 m away
- Mining project by M/s. R.K. Stone Crusher - 2.00 Ha — environmental approval granted, 750 m away
- Mining project by M/s. R.K. Stone Crusher - 2.00 Ha — environmental approval granted, 950 m away
- Sri Rounith Rao Malyala-Gravel quarry - 1.214 ha -Production @ 50550 m3/Year — environmental approval granted, 2.2 km away
- Proposed Common Biomedical Waste Treatment Facility by M/s Mahe Enterprises — lapsed, 3.1 km away
- Diversion Of 0.1072 Ha of Forest Land for Laying of Optical Fiber Cable along… — initial checks, 4.6 km away
- M/s Venkateshwara Stone Crusher, Building Stone and Road Metal Mine,1.0Ha,… — environmental approval granted, 7.2 km away
- Sri. Gugulothu Sri Ramulu - Opencast semi mechanized method of quarrying for… — environmental approval granted, 8.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.