One of 2 filings for this project. The project's main page, with every filing and where each stands: Diversion of 0.021 Ha of Forest Land for Construction of 4g Tower by Goi
Project details
| Official title | Diversion of 0.021 Ha of Forest Land for Construction of 4g Tower at Maradugu Village Under 4g Saturation Project by Goi |
|---|---|
| Status | Lapsed |
| Status since | 8 Mar 2025 |
| Application filed | 16 Dec 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Forest land | 210 m² |
| Project cost | ₹80 lakh |
| Village / locality | Maradugu |
| Taluk / tehsil | Padara |
| District | Nagarkurnool |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-04222 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 16 Dec 2024 (this page) | Lapsed | 0 acres | ₹80 lakh |
| New project filed 9 Jan 2024 | Under wildlife review | 0 acres | ₹80 lakh |
In context
10 applications in Nagarkurnool since January 2022 are in the same category (Buildings & townships): 1 approved, 6 filed or under review, and 3 withdrawn, lapsed or rejected. At 0 acres, this one is smaller than 100% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Maradugu, Padara, Nagarkurnool, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.021 Ha of Forest Land for Construction of 4g Tower by Goi — under wildlife review, 0 m away
- Diversion of 0.4377 Ha of Forest Land for LWE Phase-II Projects falling in… — under wildlife review, 4.7 km away
- Diversion of 0.4377 Ha of Forest Land for LWE Phase-II Projects falling in… — lapsed, 4.7 km away
- Diversion Of 1.1531 Ha of Forest Land for Execution of T -Fiber Project… — under wildlife review, 7.2 km away
- Diversion Of 1.1531 Ha of Forest Land for Execution of T -Fiber Project… — in-principle approval, conditions pending, 7.2 km away
- Laying of Optical Fiber Cable for 4G connectivity for the route Amrabad –… — forest land use approved, 8.7 km away
- Laying of Optical Fiber Cable for 4G connectivity for the route Amrabad –… — under wildlife review, 8.7 km away
- Diversion of 0.0186 Ha of Forest Land for Construction of 4g Mobile Towers… — under wildlife review, 11.7 km away
More from Mahesh Nair in Nagarkurnool
- Diversion of 0.220 Ha Forest Land for Construction of 4g Mobile Tower at… — under wildlife review
- Diversion of 0.22 Ha forest land for construction of 4G mobile tower at… — initial checks
- Diversion of Forest Land of 0.020 Ha for Construction of 4g Mobile Tower — under wildlife review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.