Project details
| Official title | Proposal for Diversion of 0.0186 Ha of Forest Land for Construction of 4g Mobile Towers Under 4g Saturation Project at Bakkalingayapally Village, Achampet Division Falling in Nagarkunool District in Favor of Bsnl, Mahabubnagar Operational Area |
|---|---|
| Status | Under wildlife review |
| Status since | 7 Sept 2023 |
| Application filed | 7 Sept 2023 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Bharat Sanchar Nigam Limited |
| Land area | 200 m² |
| Project cost | ₹80 lakh |
| Village / locality | Akkawaram |
| Taluk / tehsil | Achampet |
| District | Nagarkurnool |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-04475 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 7 Sept 2023 (this page) | Under wildlife review | 0 acres | ₹80 lakh |
| New project filed 6 Sept 2023 | Lapsed | 0 acres | ₹80 lakh |
In context
10 applications in Nagarkurnool since January 2022 are in the same category (Buildings & townships): 1 approved, 6 filed or under review, and 3 withdrawn, lapsed or rejected. At 0 acres, this one is smaller than 100% of them.
Where it is
Akkawaram, Achampet, Nagarkurnool, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.0186 Ha of Forest Land for Construction of 4g Mobile Towers… — lapsed, 0 m away
- Laying of Optical Fiber Cable for 4G connectivity for the route Amrabad –… — forest land use approved, 8.2 km away
- Laying of Optical Fiber Cable for 4G connectivity for the route Amrabad –… — under wildlife review, 8.2 km away
- Diversion Of 1.1531 Ha of Forest Land for Execution of T -Fiber Project… — under wildlife review, 9.7 km away
- Diversion Of 1.1531 Ha of Forest Land for Execution of T -Fiber Project… — in-principle approval, conditions pending, 9.7 km away
- Diversion of 0.021 Ha of Forest Land for Construction of 4g Tower by Goi — lapsed, 11.7 km away
- Diversion of 0.021 Ha of Forest Land for Construction of 4g Tower by Goi — under wildlife review, 11.7 km away
- Diversion of 0.4377 Ha of Forest Land for LWE Phase-II Projects falling in… — lapsed, 11.7 km away
All 1,001 Bharat Sanchar Nigam (BSNL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.