What is Developing? Open the mapMap

Decision issuedRoads & highways · Mulugu, Telangana

Laying of Optical Fibre Cable Along the Road Within the Existing to an Extend of 0.508 Ha Under Wlm Eturnagaram Mulugu District

Laying of Optical Fibre Cable Along the Road Within the Existing to an Extend of 0.508 Ha Under Wlm Eturnagaram Mulugu District is a road project in Madaram, Tadvai, Mulugu, Telangana. The site covers 1.3 acres. Its stated project cost is ₹64 lakh. As of 27 Nov 2026, its status is “Decision issued” (since 17 Apr 2024).

See it on the live map All projects in Mulugu

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Laying of Optical Fibre Cable Along the Road Within the Existing to an Extend of 0.508 Ha Under Wlm Eturnagaram Mulugu District is a road project in Madaram, Tadvai, Mulugu, Telangana. The site covers 1.3 acres.

Who is building it?

The applicant is Jio Digital Fiber Private Limited.

Has it been approved?

Yes. Its status is “Decision issued” (since 17 Apr 2024), as of 27 Nov 2026.

Where is it?

In Madaram, Tadvai, Mulugu, Telangana.

How big is it?

It has a stated cost of ₹64 lakh and a site of 1.3 acres.

When was it filed?

The application was filed on 17 Apr 2024.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Laying of Optical Fibre Cable Along the Road Within the Existing to an Extend of 0.508…

Project details

StatusDecision issued
Status since17 Apr 2024
Application filed17 Apr 2024
Approval soughtWildlife review
Application typeNew project
SectorRoads & highways
ApplicantJio Digital Fiber Private Limited
Land area1.3 acres (0.5 ha)
Project cost₹64 lakh
Village / localityMadaram
Taluk / tehsilTadvai
DistrictMulugu
StateTelangana
Location fromSite boundary on record
Our referenceWID-TG-04507

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 17 Apr 2024 (this page)Decision issued1.3 acres₹64 lakh
New project filed 17 Apr 2024Forest land use approved1.3 acres₹64 lakh

In context

18 applications in Mulugu since January 2022 are in the same category (Roads & highways): 0 approved, 10 filed or under review, and 7 withdrawn, lapsed or rejected. At 1.3 acres, this one is smaller than 87% of them.

1 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Madaram, Tadvai, Mulugu, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Jio Digital Fiber Private Limited in Mulugu

5 Jio Digital Fibre projects in Mulugu
All 787 Jio Digital Fibre projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.