Quick answers
What is this project?
For Laying of Optical Fibre Cable Between Mangapet-Pambapuram Along the Road Within the Existing Row for 0.1004 Ha Under Euturnagaram Division is a lapsed telecom project in Banjarellapur, Tadvai, Mulugu, Telangana. The site covers 0.2 acres.
Who is building it?
The applicant is Jio Digital Fiber Private Limited.
Has it been approved?
No. The application was lapsed on 22 May 2025, so it is no longer under consideration.
Where is it?
In Banjarellapur, Tadvai, Mulugu, Telangana.
How big is it?
It has a stated cost of ₹6 lakh; a site of 0.2 acres and 1,000 m² of forest land.
When was it filed?
The application was filed on 9 Mar 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 22 May 2025 |
| Application filed | 9 Mar 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Jio Digital Fiber Private Limited |
| Land area | 1,000 m² |
| Forest land | 1,000 m² |
| Project cost | ₹6 lakh |
| Village / locality | Banjarellapur |
| Taluk / tehsil | Tadvai |
| District | Mulugu |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-04292 |
In context
13 applications in Mulugu since January 2022 are in the same category (Telecom): 1 approved, 3 filed or under review, and 9 withdrawn, lapsed or rejected. At 0.2 acres, this one is smaller than 90% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Banjarellapur, Tadvai, Mulugu, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Diversion of 0.1128 Ha of Forest Land for laying of Optical Fiber Cable along… — more information requested, 0 m away
- "Diversion of 0.1128 Ha of Forest Land for laying of Optical Fiber Cable along… — lapsed, 0 m away
- Diversion of 0.020 Ha of Forest Land for Construction of 4G Mobile Tower under… — forest land use approved, 2 km away
- Diversion of 0.9629 Ha of Forest Land for laying of Optical Fiber Cable along… — lapsed, 3.6 km away
- Laying of Optical Fibre Cable Between Mangapet-Pambapuram Along the Road… — lapsed, 5.7 km away
- Diversion of 0.020 Ha of Forest Land for Construction of 4G Mobile Tower under… — forest land use approved, 6.2 km away
- Diversion of 0.020 Ha of Forest Land for Construction of 4G Mobile Tower under… — decision issued, 6.2 km away
- Diversion of 1.8850 Ha revised from 2.0175 ha of Forest Land for laying of… — more information requested, 6.7 km away
More from Jio Digital Fiber Private Limited in Mulugu
- Laying of Optical Fibre Cable Between Mangapet-Pambapuram Along the Road… — lapsed
- Laying of Optical Fibre Cable Along the Road Within the Existing to an Extend… — forest land use approved
- Laying of Optical Fibre Cable Along the Road Within the Existing to an Extend… — decision issued
- Laying of Optical Fibre Cable Along the Road Within the Existing Row Under… — under wildlife review
5 Jio Digital Fibre projects in Mulugu
All 787 Jio Digital Fibre projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.