One of 2 filings for this project. The project's main page, with every filing and where each stands: Diversion of 0.3198 Ha of Forest Land for Execution of P2P Project towards laying of…
Project details
| Official title | Diversion of 0.3198 Ha of Forest Land for Execution of P2P Project towards laying of Optical Fiber Cable along the road within the existing RoW in Forest Land in Nagarjuna Sagar Division, Nalgonda District, Telangana State. |
|---|---|
| Status | Under wildlife review |
| Status since | 12 May 2026 |
| Application filed | 12 May 2026 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | P2p Networks Private Limited |
| Land area | 4.2 acres (1.7 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Chalakurti |
| Taluk / tehsil | Peddavoora |
| District | Nalgonda |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-04593 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 12 May 2026 (this page) | Under wildlife review | 4.2 acres | ₹50 lakh |
| New project filed 12 May 2026 | More information requested | 4.2 acres | ₹50 lakh |
In context
5 applications in Nalgonda since January 2022 are in the same category (Roads & highways): 0 approved, 3 filed or under review, and 1 withdrawn, lapsed or rejected.
Where it is
Chalakurti, Peddavoora, Nalgonda, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.3198 Ha of Forest Land for Execution of P2P Project towards… — more information requested, 0 m away
- Diversion of forest land to extent of 4.8655 Ha — under wildlife review, 5 km away
- Diversion of forest land to extent of 4.8655 Ha — not approved, 6.2 km away
- 132 KV LILO to proposed 132/11 KV Nellikal LIS Substation from the existing… — initial checks, 6.5 km away
- Change in User Agency of Forest Clearance for Construction and Commissioning… — forest land use approved, 7.2 km away
- Rough Stone & Road Metal over an extent of 4.59 Ha. — environmental approval granted, 13.8 km away
- 4G Saturation project — in-principle approval, conditions pending, 19.6 km away
- Diversion Of 2.8869 Ha of Forest Land for Laying of Optical Fiber Cable along… — under wildlife review, 19.7 km away
All 11 P2p Networks projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.