Project details
| Status | In-principle approval, conditions pending |
|---|---|
| Status since | 12 Dec 2023 |
| Application filed | 21 Aug 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Mahesh Nair |
| Land area | 800 m² |
| Forest land | 1,720 m² |
| Project cost | ₹3 crore |
| Village / locality | Dasarapalli |
| Taluk / tehsil | Neredugommu |
| District | Nalgonda |
| State | Telangana |
| Location from | Site boundary on record |
| Our reference | WID-TG-04226 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 3 Nov 2023 | More information requested | 0.5 acres | ₹3 crore |
| New project filed 21 Aug 2023 (this page) | In-principle approval, conditions pending | 0.2 acres | ₹3 crore |
In context
11 applications in Nalgonda since January 2022 are in the same category (Other): 0 approved, 10 filed or under review, and 1 withdrawn, lapsed or rejected. At 0.2 acres, this one is smaller than 100% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dasarapalli, Neredugommu, Nalgonda, Telangana. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion Of 2.8869 Ha of Forest Land for Laying of Optical Fiber Cable along… — under wildlife review, 650 m away
- Diversion Of 2.8869 Ha of Forest Land for Laying of Optical Fiber Cable along… — lapsed, 650 m away
- Diversion of 16.3327 Ha of Forest Land to Irrigation Department Towards… — more information requested, 3.3 km away
- Diversion of 16.3327 Ha of Forest Land to Irrigation Department Towards… — more information requested, 3.3 km away
- Laying of Pipeline and Structures for Lift Irrigation Scheme at Kambalapally… — more information requested, 5.2 km away
- Laying of Pipeline and Structures for Lift Irrigation Scheme at Kambalapally… — lapsed, 5.2 km away
- Laying of Pipeline and structures for Lift Irrigation Scheme at Kambalapally… — lapsed, 5.8 km away
- 4G Saturation project — more information requested, 6.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.