Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 16 Nov 2023 |
| Application filed | 16 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Vasavibala Resins PVT. LTD. |
| Land area | 1.5 acres (0.6 ha) |
| Project cost | ₹4.2 crore |
| Village / locality | Venkadu |
| Taluk / tehsil | Sriperumbudur |
| District | Kanchipuram |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-00006 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 3 Aug 2024 | Lapsed | 1.5 acres | ₹4.2 crore |
| New project filed 16 Nov 2023 (this page) | Environmental approval granted | 1.5 acres | ₹4.2 crore |
In context
25 applications in Kanchipuram since January 2022 are in the same category (Industry): 16 approved, 5 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 44 days from filing to approval. At 1.5 acres, this one is smaller than 96% of them.
16 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Venkadu, Sriperumbudur, Kanchipuram, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed manufacturing unit of Polymeric Resins and Formulated Products — lapsed, 0 m away
- Proposed Expansion of Factory Building & New Canteen Building — environmental approval granted, 500 m away
- Proposed Construction od the Industrial building for Manufacturing of Power… — environmental approval granted, 1.2 km away
- Proposed to Construct the High Rise Commercial Office Building Consisting of… — environmental approval granted, 1.3 km away
- Proposed Expansion of Industrial Warehouse Building Construction by Ramanujar… — environmental approval granted, 1.5 km away
- Ordinary Earth Quarry of Thiru.S.R.Sivakumar — environmental approval granted, 1.6 km away
- Laying of Aerial Ofc Along the Road Side Which Cross the Forest Areas of… — lapsed, 1.8 km away
- Proposed Cover Glass Finishing Unit for Mobile Phone and Other Electronic… — environmental approval granted, 1.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.