Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 19 Oct 2024 |
| Application filed | 19 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Ramanujar Industrial & Logistics Parks Private Limited |
| Use | Industrial |
| Towers | 10 |
| Height | 18 m |
| Parking spaces | 103 |
| Land area | 17 acres (6.9 ha) |
| Built-up area | 44,842 m² (4,82,675 sq ft) |
| Plot area | 68,798 m² (7,40,535 sq ft) |
| Project cost | ₹86.2 crore |
| Village / locality | Pillappakkam |
| Taluk / tehsil | Sriperumbudur |
| District | Kanchipuram |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-01845 |
In context
219 applications in Kanchipuram since January 2022 are in the same category (Buildings & townships): 151 approved, 45 filed or under review, and 23 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 17 acres, this one is smaller than 51% of them.
17 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pillappakkam, Sriperumbudur, Kanchipuram, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Cover Glass Finishing Unit for Mobile Phone and Other Electronic… — environmental approval granted, 400 m away
- Proposed Additional Construction of an Industrial Building Consisting of a… — environmental approval granted, 1 km away
- Proposed manufacturing unit of Polymeric Resins and Formulated Products — lapsed, 1.5 km away
- Proposed manufacturing unit of Polymeric Resins and Formulated Products — environmental approval granted, 1.5 km away
- Proposed to Construct the High Rise Commercial Office Building Consisting of… — environmental approval granted, 1.8 km away
- Proposed Expansion of Factory Building & New Canteen Building — environmental approval granted, 2 km away
- Laying of Aerial Ofc Along the Road Side Which Cross the Forest Areas of… — lapsed, 2.4 km away
- Proposed Construction od the Industrial building for Manufacturing of Power… — environmental approval granted, 2.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.