Quick answers
What is this project?
Surandai Part I Rough Stone, Weathered Rock and Gravel Quarry is a proposed mining project in Surandai Part 1, Veerakeralamputhur, Tenkasi, Tamil Nadu. The site covers 6.1 acres.
Who is building it?
The applicant is Arumugasamy.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 22 Nov 2022), as of 27 Nov 2026.
Where is it?
In Surandai Part 1, Veerakeralamputhur, Tenkasi, Tamil Nadu.
How big is it?
It has a stated cost of ₹73 lakh and a site of 6.1 acres.
When was it filed?
The application was filed on 22 Nov 2022.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Surandai Part I Rough Stone, Weathered Rock and Gravel Quarry
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 22 Nov 2022 |
| Application filed | 22 Nov 2022 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Arumugasamy |
| Land area | 6.1 acres (2.5 ha) |
| Project cost | ₹73 lakh |
| Village / locality | Surandai Part 1 |
| Taluk / tehsil | Veerakeralamputhur |
| District | Tenkasi |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-00133 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 7 Jan 2024 | Environmental approval granted | 6.1 acres | ₹73 lakh |
| Early planning filed 22 Nov 2022 (this page) | Cleared for impact study | 6.1 acres | ₹73 lakh |
In context
74 applications in Tenkasi since January 2022 are in the same category (Mining): 65 approved, 6 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 6.1 acres, this one is smaller than 55% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 27.2 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 5 mining leases have applied within 5 km.
Where it is
Surandai Part 1, Veerakeralamputhur, Tenkasi, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Surandai Part I Rough Stone, Weathered Rock and Gravel Quarry — environmental approval granted, 0 m away
- Rough Stone, Jelly and Gravel Quarry of Thiru.R.Ponkaliraj — environmental approval granted, 450 m away
- Thiru.N.H.M.Pandian Rough Stone and Gravel Quarry — environmental approval granted, 450 m away
- Thiru.N.H.M.Pandian Rough Stone and Gravel Quarry — environmental approval granted, 450 m away
- Thiru.N.H.M.Pandian Rough Stone and Gravel Quarry — cleared for impact study, 450 m away
- TMT. C. Maheshwari Rough Stone and Gravel Quarry — environmental approval granted, 1.7 km away
- TMT. C. Maheshwari Rough Stone and Gravel Quarry — environmental approval granted, 1.8 km away
- Thiru. P. Vallimurugan Rough Stone & Gravel Quarry — environmental approval granted, 4.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.