Quick answers
What is Rough Stone, Jelly and Gravel Quarry of Thiru.R.Ponkaliraj?
Rough Stone, Jelly and Gravel Quarry of Thiru.R.Ponkaliraj is an approved mining project in An A I K U L A M, Veerakeralamputhur, Tenkasi, Tamil Nadu. The site covers 5.9 acres.
Who is building it?
The applicant is Rajendran Ponkali Raj.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 9 Aug 2023), as of 27 Nov 2026.
Where is it?
In An A I K U L A M, Veerakeralamputhur, Tenkasi, Tamil Nadu.
How big is it?
It has a stated cost of ₹78 lakh and a site of 5.9 acres.
When was it filed?
The application was filed on 9 Aug 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 9 Aug 2023 |
| Application filed | 9 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Rajendran Ponkali Raj |
| Land area | 5.9 acres (2.4 ha) |
| Project cost | ₹78 lakh |
| Village / locality | An A I K U L A M |
| Taluk / tehsil | Veerakeralamputhur |
| District | Tenkasi |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-00316 |
In context
74 applications in Tenkasi since January 2022 are in the same category (Mining): 65 approved, 6 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 5.9 acres, this one is smaller than 58% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 27.2 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 5 mining leases have applied within 5 km.
Where it is
An A I K U L A M, Veerakeralamputhur, Tenkasi, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Thiru.N.H.M.Pandian Rough Stone and Gravel Quarry — environmental approval granted, 400 m away
- Thiru.N.H.M.Pandian Rough Stone and Gravel Quarry — environmental approval granted, 400 m away
- Thiru.N.H.M.Pandian Rough Stone and Gravel Quarry — cleared for impact study, 400 m away
- Surandai Part I Rough Stone, Weathered Rock and Gravel Quarry — environmental approval granted, 450 m away
- Surandai Part I Rough Stone, Weathered Rock and Gravel Quarry — cleared for impact study, 450 m away
- TMT. C. Maheshwari Rough Stone and Gravel Quarry — environmental approval granted, 1.3 km away
- TMT. C. Maheshwari Rough Stone and Gravel Quarry — environmental approval granted, 1.4 km away
- Thiru. P. Vallimurugan Rough Stone & Gravel Quarry — environmental approval granted, 4.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.