Quick answers
What is this project?
K.Venkatraman, New Rough Stone and Gravel Quarry Project over an Extent of 1.19.0 Ha in S.F.No. 72/4 of Chinna Ulagani Village, Kallikudi Taluk, Madurai District, Tamil Nadu is an approved mining project in Chinnaulagani, Kalligudi, Madurai, Tamil Nadu. The site covers 2.9 acres.
Who is building it?
The applicant is Kalyanasundaram Venkataraman.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 29 Nov 2022), as of 27 Nov 2026.
Where is it?
In Chinnaulagani, Kalligudi, Madurai, Tamil Nadu.
How big is it?
It has a stated cost of ₹22 lakh and a site of 2.9 acres.
When was it filed?
The application was filed on 29 Nov 2022.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 29 Nov 2022 |
| Application filed | 29 Nov 2022 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Kalyanasundaram Venkataraman |
| Land area | 2.9 acres (1.2 ha) |
| Project cost | ₹22 lakh |
| Village / locality | Chinnaulagani |
| Taluk / tehsil | Kalligudi |
| District | Madurai |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-00210 |
In context
109 applications in Madurai since January 2022 are in the same category (Mining): 92 approved, 14 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2.9 acres, this one is smaller than 86% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 10.5 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 7 mining leases have applied within 5 km.
Where it is
Chinnaulagani, Kalligudi, Madurai, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Rough Stone and Gravel Quarry of Thiru. S. Rathinam — lapsed, 200 m away
- Rough Stone and Gravel Quarry of Thiru. S. Rathinam — environmental approval granted, 350 m away
- Rough Stone and Gravel Quarry of Thiru. S. Rathinam — cleared for impact study, 350 m away
- M. Meenatshi Rough Stone and Gravel Quarry Extent – 1.42.0 Ha 16/2B, 16/3 &… — environmental approval granted, 500 m away
- Proposed Rough stone and Gravel Quarry of Tmt.R.Chitra — cleared for impact study, 1 km away
- Tvl. Suganya Blue Metals, Rough Stone and Gravel Quarry Project at over an… — environmental approval granted, 1.2 km away
- Tvl. Suganya Blue Metals, Rough Stone and Gravel Quarry Project at over an… — cleared for impact study, 1.2 km away
- S.A. Liyakkathali, Rough stone and Gravel Quarry Project at over an Extent of… — environmental approval granted, 1.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.