Quick answers
What is Proposed Rough stone and Gravel Quarry of Tmt.R.Chitra?
Proposed Rough stone and Gravel Quarry of Tmt.R.Chitra is a proposed mining project in Achangulam, Kalligudi, Madurai, Tamil Nadu. The site covers 3.9 acres.
Who is building it?
The applicant is Chitra.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 30 Sept 2025), as of 27 Nov 2026.
Where is it?
In Achangulam, Kalligudi, Madurai, Tamil Nadu.
How big is it?
It has a stated cost of ₹69 lakh and a site of 3.9 acres.
When was it filed?
The application was filed on 9 Sept 2025.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 30 Sept 2025 |
| Application filed | 9 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Chitra |
| Land area | 3.9 acres (1.6 ha) |
| Project cost | ₹69 lakh |
| Village / locality | Achangulam |
| Taluk / tehsil | Kalligudi |
| District | Madurai |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-03533 |
In context
109 applications in Madurai since January 2022 are in the same category (Mining): 92 approved, 14 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 3.9 acres, this one is smaller than 74% of them.
No other mining lease on record is within 500 m of this site; 7 have applied within 5 km.
Where it is
Achangulam, Kalligudi, Madurai, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- M. Meenatshi Rough Stone and Gravel Quarry Extent – 1.42.0 Ha 16/2B, 16/3 &… — environmental approval granted, 550 m away
- Tvl. Suganya Blue Metals, Rough Stone and Gravel Quarry Project at over an… — environmental approval granted, 650 m away
- Tvl. Suganya Blue Metals, Rough Stone and Gravel Quarry Project at over an… — cleared for impact study, 650 m away
- S.A. Liyakkathali, Rough stone and Gravel Quarry Project at over an Extent of… — environmental approval granted, 950 m away
- Rough Stone and Gravel Quarry of Thiru. S. Rathinam — lapsed, 1 km away
- Rough Stone and Gravel Quarry of Thiru. S. Rathinam — environmental approval granted, 1 km away
- Rough Stone and Gravel Quarry of Thiru. S. Rathinam — cleared for impact study, 1 km away
- K.Venkatraman, New Rough Stone and Gravel Quarry Project over an Extent of… — environmental approval granted, 1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.