One of 2 filings for this project. The project's main page, with every filing and where each stands: R.Rajmohan Rough Stone Quarry Extant:1.25.0Ha Eripudur Village Vazhapadi Taluk Salem…
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 6 Apr 2024 |
| Application filed | 21 Feb 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Rajappan Rajmohan |
| Land area | 3.1 acres (1.3 ha) |
| Project cost | ₹62 lakh |
| Village / locality | Erippudur |
| Taluk / tehsil | Vazhapadi |
| District | Salem |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-00303 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 28 Nov 2025 | Environmental approval granted | 3.1 acres | |
| New project filed 21 Feb 2024 (this page) | Environmental approval granted | 3.1 acres | ₹62 lakh |
In context
182 applications in Salem since January 2022 are in the same category (Mining): 113 approved, 37 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 3.1 acres, this one is smaller than 66% of them.
3 other mining leases have applied within 500 m of this site; together with this one they cover 15.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 13 mining leases have applied within 5 km.
Where it is
Erippudur, Vazhapadi, Salem, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- R.Rajmohan Rough Stone Quarry Extant:1.25.0Ha Eripudur Village Vazhapadi Taluk… — environmental approval granted, 0 m away
- P. Ravikumar, Rough stone and Gravel Quarry Project at over an Extent of… — environmental approval granted, 100 m away
- Proposed Rough Stone Quarry of Tvl.Hindustan Stone Crusher — lapsed, 200 m away
- Eripudur Village Rough stone and Gravel Mining Project — under environmental review, 350 m away
- Thiru A. Rajaraja Cholan Rough Stone Quarry Project — environmental approval granted, 1000 m away
- Sumathi Rough Stone and Gravel Quarry, Extent: 1.50.5ha, S.F. No: 106 (P-III),… — environmental approval granted, 1.1 km away
- S.Dhanapal, Rough Stone Quarry Project over an Extent of 1.00.0Ha of… — cleared for impact study, 1.1 km away
- Thiru. S. Dhanapal Rough Stone Quarry Project — environmental approval granted, 1.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.