Project details
| Status | Under environmental review |
|---|---|
| Status since | 23 Nov 2026 |
| Application filed | 27 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Sr Mines |
| Land area | 3.6 acres (1.5 ha) |
| Project cost | ₹74 lakh |
| Village / locality | Erippudur |
| Taluk / tehsil | Vazhapadi |
| District | Salem |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-06989 |
In context
182 applications in Salem since January 2022 are in the same category (Mining): 113 approved, 37 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 3.6 acres, this one is smaller than 60% of them.
3 other mining leases have applied within 500 m of this site; together with this one they cover 15.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 12 mining leases have applied within 5 km.
Where it is
Erippudur, Vazhapadi, Salem, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Rough Stone Quarry of Tvl.Hindustan Stone Crusher — lapsed, 150 m away
- P. Ravikumar, Rough stone and Gravel Quarry Project at over an Extent of… — environmental approval granted, 250 m away
- R.Rajmohan Rough Stone Quarry Extant:1.25.0Ha Eripudur Village Vazhapadi Taluk… — environmental approval granted, 350 m away
- R.Rajmohan Rough Stone Quarry Extant:1.25.0Ha Eripudur Village Vazhapadi Taluk… — environmental approval granted, 350 m away
- Thiru A. Rajaraja Cholan Rough Stone Quarry Project — environmental approval granted, 650 m away
- Sumathi Rough Stone and Gravel Quarry, Extent: 1.50.5ha, S.F. No: 106 (P-III),… — environmental approval granted, 750 m away
- S.Dhanapal, Rough Stone Quarry Project over an Extent of 1.00.0Ha of… — cleared for impact study, 800 m away
- Thiru. S. Dhanapal Rough Stone Quarry Project — environmental approval granted, 800 m away