Quick answers
What is this project?
Tvl. Arjun Associates, Fireclay Quarry project over an Extent of 4.50.5Ha of Patta land in S.F.Nos. 5/1A2, 5/1B, 5/1C2, 5/1D, 5/2, 5/3, 5/5, 6/11, 6/12, 6/15, 6/16, 6/17, 6/18, 6/19 & 6/20 is a proposed mining project in Managethi, Udayarpalayam, Ariyalur, Tamil Nadu. The site covers 11.1 acres.
Who is building it?
The applicant is Arjun Associates.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Managethi, Udayarpalayam, Ariyalur, Tamil Nadu.
How big is it?
It has a stated cost of ₹44 lakh and a site of 11.1 acres.
When was it filed?
The application was filed on 12 Apr 2024.
Project details
| Official title | Tvl. Arjun Associates, Fireclay Quarry project over an Extent of 4.50.5Ha of Patta land in S.F.Nos. 5/1A2, 5/1B, 5/1C2, 5/1D, 5/2, 5/3, 5/5, 6/11, 6/12, 6/15, 6/16, 6/17, 6/18, 6/19 & 6/20 in Managathi Village, Udayarpalayam Taluk, Ariyalur District, Tamil Nadu State |
|---|---|
| Status | Under environmental review |
| Status since | 12 Apr 2024 |
| Application filed | 12 Apr 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Arjun Associates |
| Land area | 11.1 acres (4.5 ha) |
| Project cost | ₹44 lakh |
| Village / locality | Managethi |
| Taluk / tehsil | Udayarpalayam |
| District | Ariyalur |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-00651 |
In context
72 applications in Ariyalur since January 2022 are in the same category (Mining): 57 approved, 10 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 11.1 acres, this one is smaller than 74% of them.
3 other mining leases have applied within 500 m of this site; together with this one they cover 41.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 3 mining leases have applied within 5 km.
Where it is
Managethi, Udayarpalayam, Ariyalur, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Managathi Village Fire Clay Mining Project — cleared for impact study, 200 m away
- Fireclay Quarry Belongs to Tvl. Ariyalur Minerals Private Limited — under environmental review, 250 m away
- M.Aruna,Fireclay , Extent of 1.78.11ha in S.F.Nos. 6/3, 6/4 — environmental approval granted, 250 m away
- Anandavadi Limestone Block, e-Auction Mineral Block under LOI 402/MMA.2/2026-1… — under environmental review, 8.7 km away
- Laying of Aerial Ofc Thorough Tneb Poles (Existing-6),which Is Outside of the… — more information requested, 9.1 km away
- Unjini – Anandawadi Limestone Block Over an Area of 41.36.0 Ha at Unjini &… — under environmental review, 9.2 km away
- Industrial project by M/s. UltraTech Cement Ltd., Unit: Reddipalayam Cement… — initial checks, 9.6 km away
- EC for UT Periyanagalur Limestone Mine - Extent 4.985 Ha & Proposed Production… — environmental approval granted, 9.8 km away