Quick answers
What is Managathi Village Fire Clay Mining Project?
Managathi Village Fire Clay Mining Project is a proposed mining project in Managethi, Udayarpalayam, Ariyalur, Tamil Nadu. The site covers 9.7 acres.
Who is building it?
The applicant is Alagiamanavalan a P.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 7 Aug 2026), as of 27 Nov 2026.
Where is it?
In Managethi, Udayarpalayam, Ariyalur, Tamil Nadu.
How big is it?
It has a stated cost of ₹31 lakh and a site of 9.7 acres.
When was it filed?
The application was filed on 28 Apr 2026.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 7 Aug 2026 |
| Application filed | 28 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Alagiamanavalan a P |
| Land area | 9.7 acres (3.9 ha) |
| Project cost | ₹31 lakh |
| Village / locality | Managethi |
| Taluk / tehsil | Udayarpalayam |
| District | Ariyalur |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-04864 |
In context
72 applications in Ariyalur since January 2022 are in the same category (Mining): 57 approved, 10 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 9.7 acres, this one is smaller than 78% of them.
3 other mining leases have applied within 500 m of this site; together with this one they cover 41.3 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 3 mining leases have applied within 5 km.
Where it is
Managethi, Udayarpalayam, Ariyalur, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Tvl. Arjun Associates, Fireclay Quarry project over an Extent of 4.50.5Ha of… — under environmental review, 200 m away
- Fireclay Quarry Belongs to Tvl. Ariyalur Minerals Private Limited — under environmental review, 300 m away
- M.Aruna,Fireclay , Extent of 1.78.11ha in S.F.Nos. 6/3, 6/4 — environmental approval granted, 450 m away
- Anandavadi Limestone Block, e-Auction Mineral Block under LOI 402/MMA.2/2026-1… — under environmental review, 8.8 km away
- Laying of Aerial Ofc Thorough Tneb Poles (Existing-6),which Is Outside of the… — more information requested, 8.9 km away
- Unjini – Anandawadi Limestone Block Over an Area of 41.36.0 Ha at Unjini &… — under environmental review, 9.2 km away
- Industrial project by M/s. UltraTech Cement Ltd., Unit: Reddipalayam Cement… — initial checks, 9.4 km away
- EC for UT Periyanagalur Limestone Mine - Extent 4.985 Ha & Proposed Production… — environmental approval granted, 9.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.