Quick answers
What is this project?
Thiru. S. Jayalani, Rough stone and Gravel Quarry Project over an Extent of 2.55.62 Ha of Patta Lands in S.F.Nos. 363/3, 363/4, 363/5, 364/1, 364/2, 364/3, 364/4, 364/5, 365/1, 366/1A, 366/2A, 367/1A, 368/1A, 368/2, 368/3, 368/4, 368/5, 368/6, 368/7 and 368/8 of Madathur Village, Alangulam Taluk, Tenkasi District, Tamil Nadu State is an approved mining project in Madattur, Alangulam, Tenkasi, Tamil Nadu. The site covers 6.3 acres.
Who is building it?
The applicant is Saburbathusha Jayalani.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 6 Dec 2023), as of 27 Nov 2026.
Where is it?
In Madattur, Alangulam, Tenkasi, Tamil Nadu.
How big is it?
It has a stated cost of ₹1.2 crore and a site of 6.3 acres.
When was it filed?
The application was filed on 6 Dec 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 6 Dec 2023 |
| Application filed | 6 Dec 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Saburbathusha Jayalani |
| Land area | 6.3 acres (2.6 ha) |
| Project cost | ₹1.2 crore |
| Village / locality | Madattur |
| Taluk / tehsil | Alangulam |
| District | Tenkasi |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-00897 |
In context
74 applications in Tenkasi since January 2022 are in the same category (Mining): 65 approved, 6 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 6.3 acres, this one is smaller than 53% of them.
No other mining lease on record is within 500 m of this site; 7 have applied within 5 km.
Where it is
Madattur, Alangulam, Tenkasi, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Rough Stone & Gravel Quarry of Thiru .M.Sivan Suratha — environmental approval granted, 1.7 km away
- Rough Stone and Gravel Quarry of Thiru.S.P.Jeyachandran at Survey Nos. 617/1,… — under wildlife review, 2.3 km away
- Rough Stone and Gravel Quarry of Thiru.S.P.Jeyachandran — lapsed, 2.3 km away
- Rough Stone and Gravel Quarry of Tmt.B.Lakshmi Rajam. — environmental approval granted, 2.5 km away
- Rough Stone & Gravel Quarry of Thiru.A.Pondev Pradeep — environmental approval granted, 3.1 km away
- A.P. Nadanur Rough Stone, Weathered Rock & Gravel Quarry — environmental approval granted, 3.6 km away
- A.P. Nadanur Rough Stone, Weathered Rock & Gravel Quarry — cleared for impact study, 3.6 km away
- K.Rajkumar Rough Stone and Gravel Quarry Project Extent:4.27.4ha S.F. Nos… — environmental approval granted, 3.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.