Quick answers
What is Rough Stone & Gravel Quarry of Thiru.A.Pondev Pradeep?
Rough Stone & Gravel Quarry of Thiru.A.Pondev Pradeep is an approved mining project in Vengadampatti, Alangulam, Tenkasi, Tamil Nadu. The site covers 7.9 acres.
Who is building it?
The applicant is Pondev Pradeep.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 8 Jan 2025), as of 27 Nov 2026.
Where is it?
In Vengadampatti, Alangulam, Tenkasi, Tamil Nadu.
How big is it?
It has a stated cost of ₹93 lakh and a site of 7.9 acres.
When was it filed?
The application was filed on 13 Dec 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 8 Jan 2025 |
| Application filed | 13 Dec 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Pondev Pradeep |
| Land area | 7.9 acres (3.2 ha) |
| Project cost | ₹93 lakh |
| Village / locality | Vengadampatti |
| Taluk / tehsil | Alangulam |
| District | Tenkasi |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-01590 |
In context
74 applications in Tenkasi since January 2022 are in the same category (Mining): 65 approved, 6 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 7.9 acres, this one is larger than 65% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Vengadampatti, Alangulam, Tenkasi, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Rough Stone & Gravel Quarry of Thiru .M.Sivan Suratha — environmental approval granted, 1.4 km away
- Thiru. S. Jayalani, Rough stone and Gravel Quarry Project over an Extent of… — environmental approval granted, 3.1 km away
- Rough Stone and Gravel Quarry of Thiru. S.Mohamed Ismail — environmental approval granted, 3.5 km away
- Rough Stone and Gravel Quarry of Thiru. S.Mohamed Ismail — environmental approval granted, 3.5 km away
- Roughstone, Jelly and Gravel Quarry of Thiru S.Syed Ibrahim — more information requested, 4.2 km away
- Rough Stone and Gravel Quarry of Tmt.B.Lakshmi Rajam. — environmental approval granted, 4.9 km away
- Rough Stone and Gravel Quarry of Thiru.S.P.Jeyachandran at Survey Nos. 617/1,… — under wildlife review, 5.4 km away
- Rough Stone and Gravel Quarry of Thiru.S.P.Jeyachandran — lapsed, 5.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.