One of 2 filings for this project. The project's main page, with every filing and where each stands: Rough Stone Quarry of Tmt. C.Seeniyammal (President), Tvl.Nila Magalir Sangam
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 17 Oct 2023 |
| Application filed | 17 Oct 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Chandrasekar Seeniyammal |
| Land area | 4.7 acres (1.9 ha) |
| Project cost | ₹74 lakh |
| Village / locality | Teni |
| Taluk / tehsil | Theni |
| District | Theni |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-00958 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 17 Jul 2024 | Environmental approval granted | 4.7 acres | ₹74 lakh |
| Early planning filed 17 Oct 2023 (this page) | Cleared for impact study | 4.7 acres | ₹74 lakh |
In context
127 applications in Theni since January 2022 are in the same category (Mining): 93 approved, 23 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 4.7 acres, this one is smaller than 65% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 14.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 5 mining leases have applied within 5 km.
Where it is
Teni, Theni, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Rough Stone Quarry of Tmt. C.Seeniyammal (President), Tvl.Nila Magalir Sangam — environmental approval granted, 0 m away
- Proposed Rough Stone Quarry of Tvl.Velli Kalludaikum Magalir Sangam — under environmental review, 150 m away
- PROPOSED ROUGH STONE QUARRY OF M/s. ALLINAGARAM NALLAKURUMBAN KALLUDAIKKUM… — under environmental review, 450 m away
- Earth Quarry of Thiru.R.Nagendran — lapsed, 3 km away
- Thiru.R.Seenivasan Over an extent of 3.78.0hectares of Patta land in… — environmental approval granted, 4.3 km away
- Thiru.R.Seenivasan Over an extent of 3.78.0hectares of Patta land in… — cleared for impact study, 4.3 km away
- Thiru. R.Seenivasan Rough Stone and Gravel Quarry over an extent of 3.78.0… — withdrawn, 4.3 km away
- Building project by M/s. Bojaraj Textile Mills Limited — returned to applicant, 5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.