Project details
| Status | Under environmental review |
|---|---|
| Status since | 23 Oct 2026 |
| Application filed | 22 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Allinagaram Nallakurumban Kalludaikum Magalir Sangam |
| Land area | 4.9 acres (2 ha) |
| Project cost | ₹1.2 crore |
| Village / locality | Allinagaram |
| Taluk / tehsil | Theni |
| District | Theni |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-04960 |
In context
127 applications in Theni since January 2022 are in the same category (Mining): 93 approved, 23 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 4.9 acres, this one is smaller than 61% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 9.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 7 mining leases have applied within 5 km.
Where it is
Allinagaram, Theni, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Rough Stone Quarry of Tmt. C.Seeniyammal (President), Tvl.Nila Magalir Sangam — cleared for impact study, 450 m away
- Rough Stone Quarry of Tmt. C.Seeniyammal (President), Tvl.Nila Magalir Sangam — environmental approval granted, 450 m away
- Proposed Rough Stone Quarry of Tvl.Velli Kalludaikum Magalir Sangam — under environmental review, 500 m away
- Earth Quarry of Thiru.R.Nagendran — lapsed, 2.7 km away
- Thiru.R.Seenivasan Over an extent of 3.78.0hectares of Patta land in… — environmental approval granted, 4 km away
- Thiru.R.Seenivasan Over an extent of 3.78.0hectares of Patta land in… — cleared for impact study, 4 km away
- Thiru. R.Seenivasan Rough Stone and Gravel Quarry over an extent of 3.78.0… — withdrawn, 4 km away
- Building project by M/s. Bojaraj Textile Mills Limited — returned to applicant, 4.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.