Proposed Expansion and construction of data centre building by M/s. Evita Constructions Private Limited is an approved building project in Senthamangalam, Chengalpattu, Tamil Nadu. The site covers 19.6 acres.
Who is building it?
The applicant is Evita Constructions Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 3 Aug 2023), as of 27 Nov 2026.
Where is it?
In Senthamangalam, Chengalpattu, Tamil Nadu.
How big is it?
It has a stated cost of ₹2.1 crore and a site of 19.6 acres.
When was it filed?
The application was filed on 3 Aug 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 3 Aug 2023 |
| Application filed | 3 Aug 2023 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Evita Constructions Private Limited |
| Land area | 19.6 acres (8 ha) |
| Project cost | ₹2.1 crore |
| Village / locality | Senthamangalam |
| Taluk / tehsil | Chengalpattu |
| District | Chengalpattu |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-01238 |
In context
302 applications in Chengalpattu since January 2022 are in the same category (Buildings & townships): 206 approved, 67 filed or under review, and 29 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 19.6 acres, this one is larger than 68% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Senthamangalam, Chengalpattu, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Relaying and Periodical Maintenance of Valayakaranai to Appur road — lapsed, 1.8 km away
- Thiru.R.Vasanth Earth Quarry — environmental approval granted, 3.2 km away
- Diversion of Forest Land for Underground Sewerage System to Leftout Areas — lapsed, 3.5 km away
- Diversion of Forest Land for Underground Sewerage System to Leftout Areas — lapsed, 5.1 km away
- Underground Sewerage System to Leftout areas in Maraimalai Nagar Municipality — lapsed, 5.2 km away
- Industrial Buildings - Factory Building (Manufacturing of Bellows Assembly,… — environmental approval granted, 5.6 km away
- Laying of Aerial OFC along the road side across Paranur R.F. and Siruvanjur… — lapsed, 5.9 km away
- Industrial Sheds and Warehousing Units for M/s. ARDS Quantumcorp Industrial… — environmental approval granted, 6.1 km away
All 5 Evita Constructions projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.