Quick answers
What is this project?
KUMARAN MINES LIMESTONE MINE Project EXTENT – 1.01.0 ha S.F. Nos – 128/8A, 9, 10A, 12B, 13, Pannaimoondradaippu Village, Tiruchuli Taluk, Virudhunagar District is a proposed mining project in Pannaimunradaippu, Tiruchuli, Virudhunagar, Tamil Nadu. The site covers 2.5 acres.
Who is building it?
The applicant is Kumaran Mines.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Pannaimunradaippu, Tiruchuli, Virudhunagar, Tamil Nadu.
How big is it?
It has a stated cost of ₹15 lakh and a site of 2.5 acres.
When was it filed?
The application was filed on 6 Jul 2023.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 6 Jul 2023 |
| Application filed | 6 Jul 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Kumaran Mines |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹15 lakh |
| Village / locality | Pannaimunradaippu |
| Taluk / tehsil | Tiruchuli |
| District | Virudhunagar |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-01304 |
In context
207 applications in Virudhunagar since January 2022 are in the same category (Mining): 152 approved, 34 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2.5 acres, this one is smaller than 91% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Pannaimunradaippu, Tiruchuli, Virudhunagar, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Rough Stone and Gravel Quarry Of Thiru. R. Ramasamy — environmental approval granted, 4.5 km away
- Puliyuran & Keelakandamankalam Village Rough Stone and Gravel Mining Project — environmental approval granted, 5.7 km away
- VISHNU SURYA PROJECTS AND INFRA PRIVATE LIMITED Rough Stone and Gravel Quarry… — not approved, 5.8 km away
- VISHNU SURYA PROJECTS AND INFRA PRIVATE LIMITED Rough Stone and Gravel Quarry… — environmental approval granted, 5.8 km away
- VISHNU SURYA PROJECTS AND INFRA PRIVATE LIMITED Rough Stone and Gravel Quarry… — cleared for impact study, 5.8 km away
- VISHNU SURYA PROJECTS AND INFRA PRIVATE LIMITED Rough Stone and Gravel Quarry… — environmental approval granted, 5.8 km away
- Thiru. S. Gurusamy Rough stone, Jelly and Gravel quarry — environmental approval granted, 9.6 km away
- Thiru. S. Gurusamy Rough stone, Jelly and Gravel quarry — environmental approval granted, 9.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.