Quick answers
What is this project?
Proposed expansion of foundry unit located at S.F. No. 478/1 & 2, Ponnandampalayam, Kaniyur Village, Sulur Taluk, Coimbatore District is a proposed industrial project in Kaniyur, Sulur, Coimbatore, Tamil Nadu. The site covers 5.6 acres.
Who is building it?
The applicant is V R Foundries.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 18 Oct 2023), as of 27 Nov 2026.
Where is it?
In Kaniyur, Sulur, Coimbatore, Tamil Nadu.
How big is it?
It has a stated cost of ₹123 crore and a site of 5.6 acres.
When was it filed?
The application was filed on 18 Oct 2023.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 18 Oct 2023 |
| Application filed | 18 Oct 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | V R Foundries |
| Land area | 5.6 acres (2.3 ha) |
| Project cost | ₹123 crore |
| Village / locality | Kaniyur |
| Taluk / tehsil | Sulur |
| District | Coimbatore |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-01321 |
In context
13 applications in Coimbatore since January 2022 are in the same category (Industry): 10 approved, 1 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 5.6 acres, this one is smaller than 85% of them.
8 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kaniyur, Sulur, Coimbatore, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed expansion of Industrial Building — under environmental review, 1.4 km away
- Building project by Gmr Coimbatore Logistics Private Limited — environmental approval granted, 2.6 km away
- Proposed Expansion to Construction of KPR College of Arts, Science and… — under environmental review, 2.7 km away
- KPR Institute of Engineering and Technology College by M/s. K.P.R Charities — returned to applicant, 3 km away
- Proposed Expansion to Construction of KPR Institute of Engineering and… — environmental approval granted, 3.1 km away
- Industrial Park for total area of 227.685 acres by M/s. Codissia Industrial… — lapsed, 3.4 km away
- KARTHIPURAM - Proposed Layout project by P.Karthikeyan and K.Naven — environmental approval granted, 5 km away
- KARTHIPURAM - Proposed Layout project by P.Karthikeyan and K.Naven — cleared for impact study, 5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.