Arungal Ordinary Earth Quarry Project is an approved mining project in Reserved, Chengalpattu, Tamil Nadu. The site covers 7.4 acres.
Who is building it?
The applicant is Prakash Singamuthu.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 7 Sept 2024), as of 27 Nov 2026.
Where is it?
In Reserved, Chengalpattu, Tamil Nadu.
How big is it?
It has a stated cost of ₹6 lakh and a site of 7.4 acres.
When was it filed?
The application was filed on 7 Aug 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 7 Sept 2024 |
| Application filed | 7 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Mining |
| Applicant | Prakash Singamuthu |
| Land area | 7.4 acres (3 ha) |
| Project cost | ₹6 lakh |
| Village / locality | Reserved |
| Taluk / tehsil | Chengalpattu |
| District | Chengalpattu |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-01409 |
In context
168 applications in Chengalpattu since January 2022 are in the same category (Mining): 127 approved, 17 filed or under review, and 24 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 7.4 acres, this one is larger than 52% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Reserved, Chengalpattu, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Laying of Optical Fibre Cable (Under Ground) — lapsed, 850 m away
- Relaying and Periodical Maintenance of GST Road to Nallambakkam (via) Kattur,… — lapsed, 1.3 km away
- Laying of Optical Fibre Cable (Under Ground) — lapsed, 1.4 km away
- Laying of Aerial OFC along the roadside which across Kumuli R.F., Unnamancheri… — lapsed, 2.1 km away
- Revalidation for Construction of Residential Township — environmental approval granted, 2.2 km away
- Revalidation for Construction of Residential Township — returned to applicant, 2.2 km away
- Revalidation for Construction of Residential Township — cleared for impact study, 2.2 km away
- Approach access to Arulmigu Sri Thirupura Sundari Samedha Arulmigu sri… — lapsed, 2.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.