Quick answers
What is Laying of Optical Fibre Cable (Under Ground)?
Laying of Optical Fibre Cable (Under Ground) is a lapsed telecom project in Vandalur, Chengalpattu, Tamil Nadu. The site covers 0.1 acres.
Who is building it?
The applicant is Vijeyakumar Raja.
Has it been approved?
No. The application was lapsed on 8 Jul 2024, so it is no longer under consideration.
Where is it?
In Vandalur, Chengalpattu, Tamil Nadu.
How big is it?
It has a stated cost of ₹22 lakh; a site of 0.1 acres and 300 m² of forest land.
When was it filed?
The application was filed on 10 Jul 2023.
Project details
| Official title | Laying of Optical Fibre Cable (Under Ground) in Arungal village of Kumuli Reserve Forest in Chengalpattu District |
|---|---|
| Status | Lapsed |
| Status since | 8 Jul 2024 |
| Application filed | 10 Jul 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Vijeyakumar Raja |
| Land area | 300 m² |
| Forest land | 300 m² |
| Project cost | ₹22 lakh |
| Village / locality | Vandalur |
| Taluk / tehsil | Chengalpattu |
| District | Chengalpattu |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-06058 |
In context
46 applications in Chengalpattu since January 2022 are in the same category (Telecom): 1 approved, 3 filed or under review, and 42 withdrawn, lapsed or rejected. At 0.1 acres, this one is smaller than 93% of them.
27 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Vandalur, Chengalpattu, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Relaying and Periodical Maintenance of GST Road to Nallambakkam (via) Kattur,… — lapsed, 100 m away
- Arungal Ordinary Earth Quarry Project — environmental approval granted, 1.4 km away
- Laying of Aerial OFC along the roadside which across Kumuli R.F., Unnamancheri… — lapsed, 1.6 km away
- Ordinary Earth Quarry-Nandivaram Village — environmental approval granted, 1.7 km away
- Laying of Optical Fibre Cable (Under Ground) — lapsed, 1.8 km away
- Revalidation for Construction of Residential Township — environmental approval granted, 2.2 km away
- Revalidation for Construction of Residential Township — returned to applicant, 2.2 km away
- Revalidation for Construction of Residential Township — cleared for impact study, 2.2 km away
More from Vijeyakumar Raja in Chengalpattu
- Laying of Optical Fibre Cable (Under Ground) — lapsed
- Laying of Optical Fibre Cable (Under Ground) — lapsed
- Laying of Optical Fibre Cable (Under Ground) — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.