Quick answers
What is Skid Mounted Compressed Bio Gas (Cbg) Storage Unit?
Skid Mounted Compressed Bio Gas (Cbg) Storage Unit is an approved industrial building project in Sembankuppam, Cuddalore, Tamil Nadu. The site covers 0.1 acres.
Who is building it?
The applicant is Covestro (India) Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 31 May 2024), as of 27 Nov 2026.
Where is it?
In Sembankuppam, Cuddalore, Tamil Nadu.
How big is it?
It has a stated cost of ₹3 crore and a site of 0.1 acres.
When was it filed?
The application was filed on 2 May 2024.
Project details
| Official title | Proposed Installation of Skid Mounted Compressed Bio Gas (Cbg) Storage Unit Along With Its Pre-Fabricated Portable Computer Room in the Crz-Iii (Ndz) Within the Existing Site |
|---|---|
| Status | Environmental approval granted |
| Status since | 31 May 2024 |
| Application filed | 2 May 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Covestro (India) Private Limited |
| Use | Industrial |
| Land area | 300 m² |
| Project cost | ₹3 crore |
| Village / locality | Sembankuppam |
| Taluk / tehsil | Cuddalore |
| District | Cuddalore |
| State | Tamil Nadu |
| Location from | Site area on record |
| Our reference | WID-TN-02395 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 2 May 2024 (this page) | Environmental approval granted | 0.1 acres | ₹3 crore |
| New project filed 21 Dec 2023 | Recommended by coastal authority | 7.3 acres | ₹3 crore |
In context
8 applications in Cuddalore since January 2022 are in the same category (Buildings & townships): 2 approved, 6 filed or under review, and 0 withdrawn, lapsed or rejected.
22 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sembankuppam, Cuddalore, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed increased in the production of Thermoplastic Polyurethane (TPU) from… — withdrawn, 0 m away
- Skid Mounted Compressed Bio Gas (Cbg) Storage Unit — recommended by coastal authority, 0 m away
- Proposed Vinyl Chloride Monomer (VCM) Manufacturing Unit of 750000 TPA — under environmental review, 300 m away
- Green Belt Within the Crz Area Over an Extent of 27.826 Acres Falls in Sipcot… — recommended by coastal authority, 350 m away
- Proposed Expansion of Integrated Silica Plant by TATA Chemicals Limited — initial checks, 450 m away
- Proposed Expansion of Integrated Silica Plant by M/s. Tata Chemicals Limited — under environmental review, 450 m away
- Integrated Silica Plant by M/s. Tata Chemicals Limited — returned to applicant, 450 m away
- Expansion of the Existing Spvc Plant From 600 Kta to 1200 Kta, With Backward… — under environmental review, 500 m away
More from Covestro (India) Private Limited in Cuddalore
3 Covestro projects in Cuddalore
All 4 Covestro projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.