What is Developing? Open the mapMap

Under environmental reviewIndustry · Cuddalore, Tamil Nadu

Expansion of the Existing Spvc Plant From 600 Kta to 1200 Kta, With Backward Integration of the Raw Material Vcm of 750 Kta Capacity

Expansion of the Existing Spvc Plant From 600 Kta to 1200 Kta, With Backward Integration of the Raw Material Vcm of 750 Kta Capacity is a proposed industrial project in Tiyagavalli, Cuddalore, Tamil Nadu. The site covers 159.7 acres. Its stated project cost is ₹6,500 crore. As of 27 Nov 2026, its status is “Under environmental review” (since 16 Nov 2026).

See it on the live map All projects in Cuddalore

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of the Existing Spvc Plant From 600 Kta to 1200 Kta, With Backward Integration of the Raw Material Vcm of 750 Kta Capacity is a proposed industrial project in Tiyagavalli, Cuddalore, Tamil Nadu. The site covers 159.7 acres.

Who is building it?

The applicant is Chemplast Cuddalore Vinyls Limited.

Has it been approved?

Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.

Where is it?

In Tiyagavalli, Cuddalore, Tamil Nadu.

How big is it?

It has a stated cost of ₹6,500 crore and a site of 159.7 acres.

When was it filed?

The application was filed on 28 Aug 2026.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion of the Existing Spvc Plant From 600 Kta to 1200 Kta, With Backward Integration…

Project details

StatusUnder environmental review
Status since16 Nov 2026
Application filed28 Aug 2026
Approval soughtEnvironmental approval
Application typeExpansion
SectorIndustry
ApplicantChemplast Cuddalore Vinyls Limited
Land area159.7 acres (64.6 ha)
Project cost₹6,500 crore
Village / localityTiyagavalli
Taluk / tehsilCuddalore
DistrictCuddalore
StateTamil Nadu
Location fromSite boundary on record
Our referenceWID-TN-04352

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 28 Aug 2026 (this page)Under environmental review159.7 acres₹6,500 crore
Early planning filed 3 Jul 2025Cleared for impact study159.7 acres₹6,500 crore

In context

23 applications in Cuddalore since January 2022 are in the same category (Industry): 14 approved, 8 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 42 days from filing to approval. At 159.7 acres, this one is larger than 87% of them.

22 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Tiyagavalli, Cuddalore, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Chemplast Cuddalore Vinyls Limited in Cuddalore

All 8 Chemplast Cuddalore Vinyls projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.