Quick answers
What is Application for No Increase in Pollution Load?
Application for No Increase in Pollution Load is a proposed project in Vanapadi, Wallajah, Ranipet, Tamil Nadu. The site covers 11.5 acres.
Who is building it?
The applicant is Malladi Drugs & Pharmaceuticals Limited, Unit 3.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Vanapadi, Wallajah, Ranipet, Tamil Nadu.
How big is it?
It has a stated cost of ₹147 crore and a site of 11.5 acres.
When was it filed?
The application was filed on 4 Jan 2025.
Project details
| Status | Initial checks |
|---|---|
| Status since | 4 Jan 2025 |
| Application filed | 4 Jan 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Other |
| Applicant | Malladi Drugs & Pharmaceuticals Limited, Unit 3 |
| Land area | 11.5 acres (4.6 ha) |
| Project cost | ₹147 crore |
| Village / locality | Vanapadi |
| Taluk / tehsil | Wallajah |
| District | Ranipet |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-02614 |
In context
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Vanapadi, Wallajah, Ranipet, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Construction of Residential Building by Valley Vistas Hotel Private… — under environmental review, 3.3 km away
- Water Supply Improvement Scheme — lapsed, 5 km away
- Laying of Aerial Ofc Along the Road Side Which Cross the Forest Areas of… — lapsed, 5.4 km away
- New Api Unit With Production Capacity of 3336 Tpa by Nanjil Indudtries — environmental approval granted, 5.4 km away
- New Api Unit With Production Capacity of 3336 Tpa — lapsed, 5.4 km away
- Application for No Increase in Pollution Load — initial checks, 5.5 km away
- Proposed Active Pharmaceutical Ingredients (API) & Intermediates Manufacturing… — cleared for impact study, 5.6 km away
- Proposed Manufacturing facility for Water & Solvent-Based PU Adhesives,… — environmental approval granted, 5.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.