Quick answers
What is this project?
Proposed Manufacturing facility for Water & Solvent-Based PU Adhesives, Primers, and Hardeners is an approved industrial project in Mukundarayapuram, Wallajah, Ranipet, Tamil Nadu. The site covers 10 acres.
Who is building it?
The applicant is Nan Pao Materials Resins India Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 23 Jul 2025), as of 27 Nov 2026.
Where is it?
In Mukundarayapuram, Wallajah, Ranipet, Tamil Nadu.
How big is it?
It has a stated cost of ₹110.1 crore and a site of 10 acres.
When was it filed?
The application was filed on 4 Jun 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 23 Jul 2025 |
| Application filed | 4 Jun 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Nan Pao Materials Resins India Private Limited |
| Land area | 10 acres (4.1 ha) |
| Project cost | ₹110.1 crore |
| Village / locality | Mukundarayapuram |
| Taluk / tehsil | Wallajah |
| District | Ranipet |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-04258 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 4 Jun 2025 (this page) | Environmental approval granted | 10 acres | ₹110.1 crore |
| Early planning filed 17 Jan 2025 | Cleared for impact study | 10 acres | ₹110.1 crore |
In context
8 applications in Ranipet since January 2022 are in the same category (Industry): 6 approved, 0 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 34 days from filing to approval.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mukundarayapuram, Wallajah, Ranipet, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Manufacturing facility for Water & Solvent-Based PU Adhesives,… — cleared for impact study, 0 m away
- Mukuntharayapuram Village Earth Mining Lease — returned to applicant, 350 m away
- Application for No Increase in Pollution Load — initial checks, 450 m away
- New Api Unit With Production Capacity of 3336 Tpa by Nanjil Indudtries — environmental approval granted, 450 m away
- New Api Unit With Production Capacity of 3336 Tpa — lapsed, 450 m away
- Proposed Active Pharmaceutical Ingredients (API) & Intermediates Manufacturing… — cleared for impact study, 850 m away
- Muguntharayapuram Village Gravel and Rough Stone Mining Project — not approved, 2.5 km away
- Application for No Increase in Pollution Load — initial checks, 5.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.