Quick answers
What is this project?
KOMARAPALAYAM VILLAGE, Rough Stone and Gravel Quarry Project Belongs to M/s. Kongu Blue Metals is an approved mining project in Komarapalaiyam, Dharapuram, Tiruppur, Tamil Nadu. The site covers 7.2 acres.
Who is building it?
The applicant is Kongu Blue Metals.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 18 Nov 2025), as of 27 Nov 2026.
Where is it?
In Komarapalaiyam, Dharapuram, Tiruppur, Tamil Nadu.
How big is it?
It has a stated cost of ₹2 lakh and a site of 7.2 acres.
When was it filed?
The application was filed on 8 Sept 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 18 Nov 2025 |
| Application filed | 8 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Kongu Blue Metals |
| Land area | 7.2 acres (2.9 ha) |
| Project cost | ₹2 lakh |
| Village / locality | Komarapalaiyam |
| Taluk / tehsil | Dharapuram |
| District | Tiruppur |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-02738 |
In context
205 applications in Tiruppur since January 2022 are in the same category (Mining): 147 approved, 41 filed or under review, and 17 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 7.2 acres, this one is larger than 75% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Komarapalaiyam, Dharapuram, Tiruppur, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Rough Stone Quarry of Thiru. S. Durairaj — under environmental review, 9.1 km away
- Proposed Expansion of Industrial Building by M/s. Eveready Cotton Mills Pvt Ltd. — initial checks, 14.5 km away
- Ponnivadi Rough Stone and Gravel Quarry Project Belongs to Thiru. B. Saran… — environmental approval granted, 18.6 km away
- Quartz & Feldspar Quarry Project Belongs to M/s. Chettinad Morimura… — environmental approval granted, 19 km away
- Tvl. MVS Crushers, Rough stone and Gravel Quarry Project at over an Extent of… — environmental approval granted, 23.3 km away
- Tvl. MVS Crushers, Rough stone and Gravel Quarry Project at over an Extent of… — environmental approval granted, 23.3 km away
- R.Senthilkumar, Rough Stone Quarry Project Extent: 2.50.0ha S.F.No. 252/2 Part… — environmental approval granted, 23.6 km away
- Rough Stone Quarry of Thiru D. Subash Chandra Bose — cleared for impact study, 24.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.