Project details
| Official title | Construction of Industrial Buildings at M/s. Polyhose India Private Ltd |
|---|---|
| Status | Environmental approval granted |
| Status since | 17 Apr 2026 |
| Application filed | 30 Sept 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Polyhose India Private Limited |
| Use | Industrial |
| Towers | 2 |
| Floors (tallest) | 2 |
| Height | 16 m |
| Land area | 11.8 acres (4.8 ha) |
| Built-up area | 38,194 m² (4,11,116 sq ft) |
| Plot area | 47,793 m² (5,14,439 sq ft) |
| Project cost | ₹48.2 crore |
| Village / locality | Thandalam |
| Taluk / tehsil | Sriperumbudur |
| District | Kanchipuram |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-02752 |
In context
219 applications in Kanchipuram since January 2022 are in the same category (Buildings & townships): 151 approved, 45 filed or under review, and 23 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 11.8 acres, this one is smaller than 58% of them.
17 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Thandalam, Sriperumbudur, Kanchipuram, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- APPROACH ACCESS TO Survey No. 753 of Katrambakkam Village OF SRIPERUMBUDUR… — not approved, 850 m away
- APPROACH ACCESS TO Survey No. 753 of Katrambakkam Village OF SRIPERUMBUDUR… — more information requested, 1.1 km away
- Pharmaceutical Products Formulation unit by M/s. Esjay Pharma Pvt. Ltd — environmental approval granted, 2.3 km away
- Proposed Revamping and Modernization of HMIL Existing Manufacturing Facility… — environmental approval granted, 2.6 km away
- Proposed Revamping and Modernization of HMIL Existing Manufacturing Facility… — cleared for impact study, 2.6 km away
- Proposed Textile Processing Chemicals Manufacturing Facility — environmental approval granted, 3.4 km away
- Proposed Textile Processing Chemicals Manufacturing Facility — environmental approval granted, 3.4 km away
- Proposed Textile Processing Chemicals Manufacturing Facility — cleared for impact study, 3.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.