Quick answers
What is Rough Stone and Gravel Quarry of Thiru. S. Devaraj?
Rough Stone and Gravel Quarry of Thiru. S. Devaraj is a proposed mining project in Gopalapuram, Vembakottai, Virudhunagar, Tamil Nadu. The site covers 10 acres.
Who is building it?
The applicant is Devaraj.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 8 Apr 2025), as of 27 Nov 2026.
Where is it?
In Gopalapuram, Vembakottai, Virudhunagar, Tamil Nadu.
How big is it?
It has a stated cost of ₹63 lakh and a site of 10 acres.
When was it filed?
The application was filed on 6 Mar 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Rough Stone and Gravel Quarry of Thiru. S.Devaraj
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 8 Apr 2025 |
| Application filed | 6 Mar 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Devaraj |
| Land area | 10 acres (4 ha) |
| Project cost | ₹63 lakh |
| Village / locality | Gopalapuram |
| Taluk / tehsil | Vembakottai |
| District | Virudhunagar |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-02789 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Early planning filed 6 Mar 2025 (this page) | Cleared for impact study | 10 acres | ₹63 lakh |
| New project filed 22 May 2023 | Environmental approval granted | 6.9 acres | ₹50 lakh |
In context
207 applications in Virudhunagar since January 2022 are in the same category (Mining): 152 approved, 34 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 10 acres, this one is larger than 75% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 15.2 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 10 mining leases have applied within 5 km.
Where it is
Gopalapuram, Vembakottai, Virudhunagar, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Thiru. A.Seethakumar Rough Stone and Gravel Quarry — under environmental review, 150 m away
- Thiru. A.Seethakumar Rough stone and Gravel Quarry — returned to applicant, 150 m away
- Rough Stone and Gravel Quarry of Thiru S. Shunmugavel — lapsed, 1.1 km away
- Rough Stone and Gravel Quarry of Thiru S. Shunmugavel — cleared for impact study, 1.1 km away
- Proposed Rough Stone & Gravel Quarry of Thiru.B.Kabildev — environmental approval granted, 1.3 km away
- Proposed Rough Stone & Gravel Quarry of Thiru.B.Kabildev — cleared for impact study, 1.3 km away
- Rough Stone and Gravel Quarry of Thiru. S.Murugesan — environmental approval granted, 1.4 km away
- Rough Stone and Gravel Quarry of Thiru. S.Murugesan — environmental approval granted, 1.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.