Quick answers
What is Rough Stone and Gravel Quarry of Thiru. S.Murugesan?
Rough Stone and Gravel Quarry of Thiru. S.Murugesan is an approved mining project in Gopalapuram, Vembakottai, Virudhunagar, Tamil Nadu. The site covers 3.1 acres.
Who is building it?
The applicant is Sanglikalai Murugesan.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 9 Oct 2026), as of 27 Nov 2026.
Where is it?
In Gopalapuram, Vembakottai, Virudhunagar, Tamil Nadu.
How big is it?
It has a stated cost of ₹44 lakh and a site of 3.1 acres.
When was it filed?
The application was filed on 11 Aug 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 9 Oct 2026 |
| Application filed | 11 Aug 2025 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Mining |
| Applicant | Sanglikalai Murugesan |
| Land area | 3.1 acres (1.3 ha) |
| Project cost | ₹44 lakh |
| Village / locality | Gopalapuram |
| Taluk / tehsil | Vembakottai |
| District | Virudhunagar |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-03614 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Validity extension filed 11 Aug 2025 (this page) | Environmental approval granted | 3.1 acres | ₹44 lakh |
| New project filed 14 Sept 2024 | Environmental approval granted | 3.1 acres | ₹44 lakh |
In context
207 applications in Virudhunagar since January 2022 are in the same category (Mining): 152 approved, 34 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 3.1 acres, this one is smaller than 82% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 7.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 9 mining leases have applied within 5 km.
Where it is
Gopalapuram, Vembakottai, Virudhunagar, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Rough Stone and Gravel Quarry of Thiru. S.Murugesan — environmental approval granted, 0 m away
- Proposed Rough Stone & Gravel Quarry of Thiru.B.Kabildev — environmental approval granted, 450 m away
- Proposed Rough Stone & Gravel Quarry of Thiru.B.Kabildev — cleared for impact study, 450 m away
- Rough Stone and Gravel Quarry of Thiru S. Shunmugavel — lapsed, 700 m away
- Rough Stone and Gravel Quarry of Thiru S. Shunmugavel — cleared for impact study, 700 m away
- Thiru. A.Seethakumar Rough Stone and Gravel Quarry — under environmental review, 1.4 km away
- Thiru. A.Seethakumar Rough stone and Gravel Quarry — returned to applicant, 1.4 km away
- Rough Stone and Gravel Quarry of Thiru. S. Devaraj — cleared for impact study, 1.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.