Project details
| Official title | Proposed Construction of Commercial Hotel Project by Chona Megatainment Malls Private Limited |
|---|---|
| Status | Environmental approval granted |
| Status since | 11 Jun 2026 |
| Application filed | 19 Nov 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Chona Megatainment Malls Private Limited |
| Use | Hotel |
| Towers | 2 |
| Floors (tallest) | 17 |
| Basements | 2 |
| Height | 54 m |
| Parking spaces | 1,269 |
| Land area | 3.1 acres (1.2 ha) |
| Built-up area | 67,693 m² (7,28,641 sq ft) |
| Plot area | 12,424 m² (1,33,731 sq ft) |
| Project cost | ₹260.1 crore |
| Village / locality | Mukondapalli |
| Taluk / tehsil | Hosur |
| District | Krishnagiri |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-02869 |
In context
78 applications in Krishnagiri since January 2022 are in the same category (Buildings & townships): 53 approved, 18 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 40 days from filing to approval. At 3.1 acres, this one is smaller than 97% of them.
20 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mukondapalli, Hosur, Krishnagiri, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Greenfield Pharmaceutical Bulk Drugs, Chemicals and API Facility by M/s.… — cleared for impact study, 850 m away
- Proposed Expansion of Factory Building by M/S. Vst Tillers Tractors Limited — environmental approval granted, 950 m away
- Building project by M/s. SSF PLASTICS INDIA LIMITED — more information requested, 950 m away
- Proposed Expansion of Industrial Sheds & Buildings within the existing plot… — initial checks, 1.1 km away
- Proposed Unsaturated Polyester Resin Manufacturing facility in the SIPCOT… — cleared for impact study, 1.3 km away
- Proposed Expansion of Bulk Drug Intermediate Facility by Increasing the… — environmental approval granted, 1.3 km away
- Proposed Expansion of Pharmaceutical Bulk Drugs, Chemicals and API Facility by… — lapsed, 1.3 km away
- Proposed Expansion of Pharmaceutical Bulk Drugs, Chemicals and API Facility by… — cleared for impact study, 1.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.