Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 15 Apr 2026 |
| Application filed | 8 Jan 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | V.S.T. Tillers Tractors Limited. |
| Use | Industrial |
| Towers | 39 |
| Floors (tallest) | 2 |
| Height | 12 m |
| Land area | 18.6 acres (7.5 ha) |
| Built-up area | 26,404 m² (2,84,210 sq ft) |
| Plot area | 75,377 m² (8,11,350 sq ft) |
| Project cost | ₹310.3 crore |
| Village / locality | Mukondapalli |
| Taluk / tehsil | Hosur |
| District | Krishnagiri |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-04470 |
In context
78 applications in Krishnagiri since January 2022 are in the same category (Buildings & townships): 53 approved, 18 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 40 days from filing to approval. At 18.6 acres, this one is smaller than 69% of them.
20 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mukondapalli, Hosur, Krishnagiri, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion of Industrial Sheds & Buildings within the existing plot… — initial checks, 300 m away
- Building project by M/s. Carborundum Universal Limited, Industrial Ceramics… — under environmental review, 500 m away
- Building project by M/s. SSF PLASTICS INDIA LIMITED — more information requested, 650 m away
- Commercial Hotel Project by Chona Megatainment Malls Private Limited — environmental approval granted, 950 m away
- Proposed Expansion of Bulk Drug Intermediate Facility by Increasing Mineral… — returned to applicant, 950 m away
- Proposed Expansion of Bulk Drug Intermediate Facility by Increasing Mineral… — environmental approval granted, 950 m away
- Proposed Expansion of Bulk Drug Intermediate Facility by Increasing Mineral… — cleared for impact study, 950 m away
- Greenfield Pharmaceutical Bulk Drugs, Chemicals and API Facility by M/s.… — cleared for impact study, 1.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.