One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Expansion of the Industrial Building by M/s. Fritzmeier Motherson Cabin…
Project details
| Status | Withdrawn |
|---|---|
| Status since | 27 Apr 2025 |
| Application filed | 27 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Fritzmeier Motherson Cabin Engineering Private Limited |
| Land area | 9.4 acres (3.8 ha) |
| Project cost | ₹151.4 crore |
| Village / locality | Singadivakkam |
| Taluk / tehsil | Kancheepuram |
| District | Kanchipuram |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-03285 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 8 Jun 2025 | Environmental approval granted | 9.4 acres | ₹151.4 crore |
| Expansion filed 27 Apr 2025 (this page) | Withdrawn | 9.4 acres | ₹151.4 crore |
In context
219 applications in Kanchipuram since January 2022 are in the same category (Buildings & townships): 151 approved, 45 filed or under review, and 23 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 9.4 acres, this one is smaller than 67% of them.
19 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Singadivakkam, Kancheepuram, Kanchipuram, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion of the Industrial Building by M/s. Fritzmeier Motherson… — environmental approval granted, 0 m away
- Expansion of Synthetic Organic Chemicals — environmental approval granted, 1.1 km away
- Ordinary Earth Quarry of Mr.P.Puvithrajan — environmental approval granted, 1.2 km away
- Singadivakkam Village Ordinary Earth Mining Project — withdrawn, 1.2 km away
- Industrial Building (Light and Heavy Engineering/ Manufacturing/Assembling… — environmental approval granted, 1.4 km away
- Athivakkam Village Ordinary Earth Mining Lease — environmental approval granted, 1.8 km away
- Motherson Electronic Components Company — more information requested, 1.8 km away
- Motherson Electronic Components Company — cleared for impact study, 1.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.