Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 22 May 2025 |
| Application filed | 7 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Milky Mist Dairy Food Private Limited |
| Use | Industrial |
| Towers | 35 |
| Floors (tallest) | 5 |
| Height | 30 m |
| Land area | 55.8 acres (22.6 ha) |
| Built-up area | 1,08,330 m² (11,66,053 sq ft) |
| Plot area | 2,26,517 m² (24,38,206 sq ft) |
| Project cost | ₹906.9 crore |
| Village / locality | Pattakkarampalayam |
| Taluk / tehsil | Perundurai |
| District | Erode |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-03427 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 7 Apr 2025 (this page) | Environmental approval granted | 55.8 acres | ₹906.9 crore |
| New project filed 10 Jan 2025 | Returned to applicant | 55.8 acres | ₹906.9 crore |
In context
20 applications in Erode since January 2022 are in the same category (Buildings & townships): 6 approved, 9 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 55.8 acres, this one is larger than 76% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pattakkarampalayam, Perundurai, Erode, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed expansion of Industrial Buildings by Milky Mist Dairy Food Private… — returned to applicant, 0 m away
- Proposed Steel Melting Shop & Steel Rolling Mill at SIPCOT Industrial Growth… — cleared for impact study, 3.5 km away
- Industrial Building by M/s. Jay Jay Mills (India) Private Limited — environmental approval granted, 3.6 km away
- Proposed Synthetic Organic Chemical manufacturing unit at Plot No, J-8pt,… — environmental approval granted, 3.8 km away
- Proposed Synthetic Organic Chemical manufacturing unit at Plot No, J-8pt,… — cleared for impact study, 3.8 km away
- Proposed Expansion of Resin Manufacturing Unit from Production Capacity of… — under environmental review, 4.2 km away
- Proposed expansion of Industrial Buildings — environmental approval granted, 4.8 km away
- Proposed synthetic organic chemicals manufacturing unit at Plot No, F-11,… — environmental approval granted, 5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.