Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 20 Aug 2026 |
| Application filed | 22 Jan 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | R B Wovens Private Limited |
| Use | Industrial |
| Towers | 16 |
| Floors (tallest) | 3 |
| Height | 18 m |
| Parking spaces | 80 |
| Land area | 17.5 acres (7.1 ha) |
| Built-up area | 23,992 m² (2,58,247 sq ft) |
| Plot area | 70,745 m² (7,61,492 sq ft) |
| Project cost | ₹238.9 crore |
| Village / locality | Ingur |
| Taluk / tehsil | Perundurai |
| District | Erode |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-04310 |
In context
20 applications in Erode since January 2022 are in the same category (Buildings & townships): 6 approved, 9 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 17.5 acres, this one is larger than 59% of them.
23 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ingur, Perundurai, Erode, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Building project by M/s Roca Bathroom Products Private Limited — environmental approval granted, 800 m away
- Proposed Expansion of Existing Industrial Area at SIPCOT Garments Division,… — environmental approval granted, 900 m away
- Proposed synthetic organic chemicals manufacturing unit at Plot No, F-11,… — environmental approval granted, 1.1 km away
- Proposed synthetic organic chemicals manufacturing unit at Plot No, F-11,… — cleared for impact study, 1.1 km away
- Proposed synthetic organic chemicals manufacturing unit at Plot No, F-11,… — cleared for impact study, 1.1 km away
- Proposed Expansion of Resin Manufacturing Unit from Production Capacity of… — under environmental review, 1.1 km away
- Proposed Synthetic Organic Chemical manufacturing unit at Plot No, J-8pt,… — environmental approval granted, 1.1 km away
- Proposed Synthetic Organic Chemical manufacturing unit at Plot No, J-8pt,… — cleared for impact study, 1.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.