Quick answers
What is this project?
Tvl. Madrasmines Private Limited, Rough Stone and Gravel Quarry Project is an approved mining project in Palur, Cheyyur, Chengalpattu, Tamil Nadu. The site covers 12.3 acres.
Who is building it?
The applicant is Madrasmines Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 29 Dec 2025), as of 27 Nov 2026.
Where is it?
In Palur, Cheyyur, Chengalpattu, Tamil Nadu.
How big is it?
It has a stated cost of ₹7 lakh and a site of 12.3 acres.
When was it filed?
The application was filed on 13 Feb 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 29 Dec 2025 |
| Application filed | 13 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Madrasmines Private Limited |
| Land area | 12.3 acres (5 ha) |
| Project cost | ₹7 lakh |
| Village / locality | Palur |
| Taluk / tehsil | Cheyyur |
| District | Chengalpattu |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-03929 |
In context
168 applications in Chengalpattu since January 2022 are in the same category (Mining): 127 approved, 17 filed or under review, and 24 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 12.3 acres, this one is larger than 93% of them.
No other mining lease on record is within 500 m of this site; 19 have applied within 5 km.
Where it is
Palur, Cheyyur, Chengalpattu, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Palur Village Rough Stone and Gravel Mine Lease — environmental approval granted, 1.6 km away
- TVL JSRIDPL-ARIPL(JV) Kadugapattu Ordinary Earth Quarry over an extent of… — environmental approval granted, 2 km away
- Tvl. JSRIDPL-ARIPL (JV)- Thondamanallur Ordinary Earth Quarry-Linear project — lapsed, 2.8 km away
- Tvl. JSRIDPL-ARIPL (JV)-, Pavunjur Ordinary Earth Quarry — lapsed, 3 km away
- TVL JSRIDPL-ARIPL(JV),M/S JSR INFRA DEVELOPRS PVT.LTD.,Akkinampattu Ordinary… — environmental approval granted, 3.1 km away
- Tvl. JSRIDPL-ARIPL (JV)_ Nelvoypalayam — lapsed, 3.1 km away
- Nelvaipalayam Rough Stone and Gravel Quarry Project Belongs to Thiru. K.… — environmental approval granted, 3.5 km away
- Rough Stone and Gravel Quarry Project Belongs to Thiru.K. Sundramoorthy — returned to applicant, 3.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.