Quick answers
What is this project?
Proposed Industrial Estate by M/s. Phoenix Kothari Footwear Limited is a proposed industrial project in Eraiyur, Veppanthattai, Perambalur, Tamil Nadu. The site covers 178.8 acres.
Who is building it?
The applicant is Phoenix Kothari Footwear Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 19 Aug 2025), as of 27 Nov 2026.
Where is it?
In Eraiyur, Veppanthattai, Perambalur, Tamil Nadu.
How big is it?
It has a stated cost of ₹117 crore and a site of 178.8 acres.
When was it filed?
The application was filed on 20 Jul 2025.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 19 Aug 2025 |
| Application filed | 20 Jul 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Phoenix Kothari Footwear Limited |
| Land area | 178.8 acres (72.3 ha) |
| Project cost | ₹117 crore |
| Village / locality | Eraiyur |
| Taluk / tehsil | Veppanthattai |
| District | Perambalur |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-04136 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 12 May 2026 | Under environmental review | 178.8 acres | ₹117 crore |
| Early planning filed 20 Jul 2025 (this page) | Cleared for impact study | 178.8 acres | ₹117 crore |
In context
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Eraiyur, Veppanthattai, Perambalur, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Industrial Estate by M/s. Phoenix Kothari Footwear Limited — under environmental review, 0 m away
- Rough Stone and Gravel Quarry of Tmt.S.Vijayalakshmi — environmental approval granted, 4.2 km away
- Erection of 33 kv HT Solar Power Transmission line with post works across… — lapsed, 4.6 km away
- Proposed Rough Stone & Gravel Quarry of Tmt.S.Vijayalakshmi — environmental approval granted, 5.1 km away
- M/s. Siva Granite Products, Keelapuliyur (S) Black Granite (Dolerite) Quarry… — cleared for impact study, 7.1 km away
- M/s. Siva Granite Products,Keelapuliyur (S) Black Granite (Dolerite) Quarry… — environmental approval granted, 7.1 km away
- Sumanth Ram Black Granite Quarry — environmental approval granted, 7.2 km away
- Sithali (West) Village Black Granite Quarry Mining Project — environmental approval granted, 8.2 km away
About this information