What is this project?
Erection of 33 kv HT Solar Power Transmission line with post works across Peraiyur R.F. in Perambalur Forest Division is a lapsed power project in Periyur, Veppanthattai, Perambalur, Tamil Nadu. The site covers 1.4 acres.
Who is building it?
The applicant is Mangal & Mangal.
Has it been approved?
No. The application was lapsed on 30 Apr 2026, so it is no longer under consideration.
Where is it?
In Periyur, Veppanthattai, Perambalur, Tamil Nadu.
How big is it?
It has a stated cost of ₹5 lakh; a site of 1.4 acres and 1.4 acres (0.6 ha) of forest land.
When was it filed?
The application was filed on 20 Aug 2025.
Project details
| Official title | Erection of 33 kv HT Solar Power Transmission line with post works across Peraiyur R.F. in Perambalur Forest Division in Perambalur District. |
|---|---|
| Status | Lapsed |
| Status since | 30 Apr 2026 |
| Application filed | 20 Aug 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Mangal & Mangal |
| Land area | 1.4 acres (0.6 ha) |
| Forest land | 1.4 acres (0.6 ha) |
| Project cost | ₹5 lakh |
| Village / locality | Periyur |
| Taluk / tehsil | Veppanthattai |
| District | Perambalur |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-05786 |
In context
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Periyur, Veppanthattai, Perambalur, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Industrial Estate by M/s. Phoenix Kothari Footwear Limited — under environmental review, 4.6 km away
- Proposed Industrial Estate by M/s. Phoenix Kothari Footwear Limited — cleared for impact study, 4.6 km away
- Proposed Rough Stone & Gravel Quarry of Tmt.S.Vijayalakshmi — environmental approval granted, 4.6 km away
- Black Granite Quarry project — environmental approval granted, 6 km away
- Rough Stone and Gravel Quarry of Tmt.S.Vijayalakshmi — environmental approval granted, 7.1 km away
- M/s. Siva Granite Products, Keelapuliyur (S) Black Granite (Dolerite) Quarry… — cleared for impact study, 10.2 km away
- M/s. Siva Granite Products,Keelapuliyur (S) Black Granite (Dolerite) Quarry… — environmental approval granted, 10.2 km away
- Sithali (West) Village Black Granite Quarry Mining Project — environmental approval granted, 11.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.