Project details
| Official title | Proposed Construction of Ferro Silicon plant with production capacity of 8000 TPA at Tamil Nadu Coke and Power limited, Thandalachery Village, Gummidipoondi, Thiruvallur Dt. |
|---|---|
| Status | Environmental approval granted |
| Status since | 16 Jun 2025 |
| Application filed | 11 May 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Tamilnadu Coke and Power Limited |
| Use | Industrial |
| Floors (tallest) | 5 |
| Height | 30 m |
| Parking spaces | 179 |
| Land area | 24.7 acres (10 ha) |
| Built-up area | 26,364 m² (2,83,779 sq ft) |
| Plot area | 99,900 m² (10,75,314 sq ft) |
| Project cost | ₹39.6 crore |
| Village / locality | Kil Mudalambedu |
| Taluk / tehsil | Gummidipoondi |
| District | Thiruvallur |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-04152 |
In context
119 applications in Thiruvallur since January 2022 are in the same category (Buildings & townships): 69 approved, 37 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 24.7 acres, this one is larger than 54% of them.
32 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kil Mudalambedu, Gummidipoondi, Thiruvallur, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Ordinary earth Quarry of Thiru.M.Palani — environmental approval granted, 2.7 km away
- Proposed Expansion in Construction of Industrial Buildings - Factory Building — under environmental review, 3.7 km away
- RMD Engineering College & RMK Matriculation School by Sri Swaminatha Naidu… — lapsed, 4 km away
- Integrated Common Hazardous Waste Treatment Storage & Disposal Facility at… — lapsed, 4 km away
- Expansion Of Grey And Ductile Iron Castings Manufacturing — environmental approval granted, 4 km away
- Expansion Of Grey And Ductile Iron Castings Manufacturing — more information requested, 4 km away
- Proposed Expansion of Steel Rolling Mill & inclusion of Steel Melting Shop in… — more information requested, 4 km away
- Proposed Expansion of Steel Rolling Mill & inclusion of Steel Melting Shop in… — cleared for impact study, 4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.