What is PROPOSED ROUGHSTONE QUARRY OF M/s. V.S.CONNSTRUCTION?
PROPOSED ROUGHSTONE QUARRY OF M/s. V.S.CONNSTRUCTION is a lapsed mining project in Padalur (E), Alathur, Perambalur, Tamil Nadu. The site covers 3.7 acres.
Who is building it?
The applicant is V S Construction.
Has it been approved?
No. The application was lapsed on 24 Dec 2025, so it is no longer under consideration.
Where is it?
In Padalur (E), Alathur, Perambalur, Tamil Nadu.
How big is it?
It has a stated cost of ₹3 crore and a site of 3.7 acres.
When was it filed?
The application was filed on 4 Nov 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 24 Dec 2025 |
| Application filed | 4 Nov 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | V S Construction |
| Land area | 3.7 acres (1.5 ha) |
| Project cost | ₹3 crore |
| Village / locality | Padalur (E) |
| Taluk / tehsil | Alathur |
| District | Perambalur |
| State | Tamil Nadu |
| Location from | Site area on record |
| Our reference | WID-TN-04196 |
In context
96 applications in Perambalur since January 2022 are in the same category (Mining): 70 approved, 15 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 3.7 acres, this one is smaller than 66% of them.
No other mining lease on record is within 500 m of this site; 28 have applied within 5 km.
Where it is
Padalur (E), Alathur, Perambalur, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- PROPOSED ROUGH STONE QUARRY OF M/s.V.S. CONSTRUCTION — not approved, 0 m away
- Proposed Roughstone quarry of M/s. Sri Manjunathan Industries — lapsed, 650 m away
- Rough Stone Quarry of M/s. Sri Manjunathan Industries — not approved, 650 m away
- Proposed Rough stone Quarry of M/s. Surya Stones — environmental approval granted, 750 m away
- Proposed Rough stone Quarry of M/s. Surya Stones — cleared for impact study, 750 m away
- Rough Stone and Gravel Quarry of Thiru. D. Balaji — environmental approval granted, 750 m away
- Rough Stone and Gravel Quarry of Thiru. D. Balaji — cleared for impact study, 750 m away
- Padalur East Village Rough Stone and Gravel Quarry Lease — environmental approval granted, 750 m away
More from V S Construction in Perambalur
- PROPOSED ROUGH STONE QUARRY OF M/s.V.S. CONSTRUCTION — not approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.