One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed to construct MSB Commercial Office Building by M/s. Arun Builders Pvt Ltd &…
Project details
| Status | Under environmental review |
|---|---|
| Status since | 29 Jul 2026 |
| Application filed | 30 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Buildings & townships |
| Applicant | Arrun Builders Private Limited |
| Use | Commercial |
| Height | 65 m |
| Land area | 8.1 acres (3.3 ha) |
| Project cost | ₹1,000 crore |
| Village / locality | Alandur |
| Taluk / tehsil | Alandur |
| District | Kanchipuram |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-04257 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 31 Aug 2026 | Environmental approval granted | 8.1 acres | ₹1,000 crore |
| Early planning filed 30 Dec 2025 (this page) | Under environmental review | 8.1 acres | ₹1,000 crore |
In context
219 applications in Kanchipuram since January 2022 are in the same category (Buildings & townships): 151 approved, 45 filed or under review, and 23 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 8.1 acres, this one is smaller than 70% of them.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Alandur, Kanchipuram, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed to construct MSB Commercial Office Building by M/s. Arun Builders Pvt… — environmental approval granted, 0 m away
- Commercial Office Building by Mr. B.Vijay and Mr. B.Gautham — environmental approval granted, 250 m away
- High Rise Building for Residential purpose by M/s Vak Engineering Private… — lapsed, 2 km away
- Construction of Fintech Tower at Fintech City ,nandambakkam, Chennai. — environmental approval granted, 2.4 km away
- Construction of Fintech Tower at Fintech City ,nandambakkam, Chennai. — environmental approval granted, 2.4 km away
- Establishment FINTECH city in Nandambakkam, Chennai — withdrawn, 2.5 km away
- Construction of Commercial Building (THE CUBE) — environmental approval granted, 2.5 km away
- Construction of Commercial Building (THE CUBE) — environmental approval granted, 2.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.