Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 11 Nov 2026 |
| Application filed | 31 Aug 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Arrun Builders Private Limited |
| Use | Commercial |
| Towers | 5 |
| Floors (tallest) | 12 |
| Basements | 3 |
| Height | 51 m |
| Parking spaces | 2,318 |
| Land area | 8.1 acres (3.3 ha) |
| Built-up area | 2,34,861 m² (25,28,020 sq ft) |
| Plot area | 35,625 m² (3,83,464 sq ft) |
| Project cost | ₹1,000 crore |
| Village / locality | Alandur |
| Taluk / tehsil | Alandur |
| District | Kanchipuram |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-05143 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 31 Aug 2026 (this page) | Environmental approval granted | 8.1 acres | ₹1,000 crore |
| Early planning filed 30 Dec 2025 | Under environmental review | 8.1 acres | ₹1,000 crore |
In context
219 applications in Kanchipuram since January 2022 are in the same category (Buildings & townships): 151 approved, 45 filed or under review, and 23 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 8.1 acres, this one is smaller than 70% of them.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Alandur, Kanchipuram, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed to construct MSB Commercial Office Building by M/s. Arun Builders Pvt… — under environmental review, 0 m away
- Commercial Office Building by Mr. B.Vijay and Mr. B.Gautham — environmental approval granted, 250 m away
- High Rise Building for Residential purpose by M/s Vak Engineering Private… — lapsed, 2 km away
- Construction of Fintech Tower at Fintech City ,nandambakkam, Chennai. — environmental approval granted, 2.4 km away
- Construction of Fintech Tower at Fintech City ,nandambakkam, Chennai. — environmental approval granted, 2.4 km away
- Establishment FINTECH city in Nandambakkam, Chennai — withdrawn, 2.5 km away
- Construction of Commercial Building (THE CUBE) — environmental approval granted, 2.5 km away
- Construction of Commercial Building (THE CUBE) — environmental approval granted, 2.5 km away