Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 7 Aug 2025 |
| Application filed | 12 Jun 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Roca Bathroom Products Private Limited |
| Use | Industrial |
| Towers | 2 |
| Height | 7 m |
| Parking spaces | 270 |
| Land area | 61.6 acres (24.9 ha) |
| Built-up area | 63,893 m² (6,87,738 sq ft) |
| Plot area | 2,12,419 m² (22,86,457 sq ft) |
| Project cost | ₹255.5 crore |
| Village / locality | Ingur |
| Taluk / tehsil | Perundurai |
| District | Erode |
| State | Tamil Nadu |
| Location from | Site area on record |
| Our reference | WID-TN-04180 |
In context
20 applications in Erode since January 2022 are in the same category (Buildings & townships): 6 approved, 9 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 61.6 acres, this one is larger than 88% of them.
26 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ingur, Perundurai, Erode, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion of Existing Industrial Area at SIPCOT Garments Division,… — environmental approval granted, 550 m away
- Proposed synthetic organic chemicals manufacturing unit at Plot No, F-11,… — environmental approval granted, 600 m away
- Proposed synthetic organic chemicals manufacturing unit at Plot No, F-11,… — cleared for impact study, 600 m away
- Proposed synthetic organic chemicals manufacturing unit at Plot No, F-11,… — cleared for impact study, 600 m away
- Proposed expansion of Industrial Buildings — environmental approval granted, 800 m away
- Proposed Expansion of Resin Manufacturing Unit from Production Capacity of… — under environmental review, 1.2 km away
- Expansion and Modification of Sponge Iron Plant {( Project area of 74.06 Acre… — cleared for impact study, 1.2 km away
- Proposed Expansion of Integrated Sponge Iron Plant (from Existing Sponge Iron… — under environmental review, 1.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.