Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 20 Feb 2026 |
| Application filed | 7 Jan 2026 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Industry |
| Applicant | Shri Ayyanar Phytochem Private Limited |
| Land area | 3 acres (1.2 ha) |
| Project cost | ₹4 crore |
| Village / locality | Karanaitangal |
| Taluk / tehsil | Sriperumbudur |
| District | Kanchipuram |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-04630 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 7 Jan 2026 (this page) | Cleared for impact study | 3 acres | ₹4 crore |
| Early planning filed 1 Sept 2025 | Cleared for impact study | 3 acres | ₹4 crore |
In context
25 applications in Kanchipuram since January 2022 are in the same category (Industry): 16 approved, 5 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 44 days from filing to approval. At 3 acres, this one is smaller than 72% of them.
17 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Karanaitangal, Sriperumbudur, Kanchipuram, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Manufacturing Unit of Synthetic Organic Chemicals – API Intermediates — cleared for impact study, 0 m away
- Proposed Expansion of Industrial Buildings (Manufacturing of Tippers,… — environmental approval granted, 1.8 km away
- The Proposed Construction of Syncot park Private Limited — under environmental review, 2.4 km away
- Additional buildings at Delphi TVS Technologies Limited, Oragadam — environmental approval granted, 2.7 km away
- Proposed Expansion of Industrial Buildings by M/s. Doowon Automotive Systems… — initial checks, 3.5 km away
- Laying of Underground Ofc Along Road Side From Serapanacheri to Panruti… — initial checks, 4.1 km away
- Laying of Underground Ofc Along Road Side From Serapanacheri to Panruti… — lapsed, 4.1 km away
- Proposed 1X10 MW Coal based Co-Gen Thermal Power Plant — environmental approval granted, 4.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.