| Status | Environmental approval granted |
|---|---|
| Status since | 7 Aug 2026 |
| Application filed | 9 Feb 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | Jcbl Marrel Tippers Private Limited |
| Use | Industrial |
| Floors (tallest) | 1 |
| Height | 17 m |
| Parking spaces | 800 |
| Land area | 23.1 acres (9.3 ha) |
| Built-up area | 28,900 m² (3,11,077 sq ft) |
| Plot area | 93,280 m² (10,04,057 sq ft) |
| Project cost | ₹81.8 crore |
| Village / locality | Vaippur |
| Taluk / tehsil | Sriperumbudur |
| District | Kanchipuram |
| State | Tamil Nadu |
| Location from | Site boundary on record |
| Our reference | WID-TN-04465 |
In context
219 applications in Kanchipuram since January 2022 are in the same category (Buildings & townships): 151 approved, 45 filed or under review, and 23 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 23.1 acres, this one is larger than 56% of them.
26 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Vaippur, Sriperumbudur, Kanchipuram, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- The Proposed Construction of Syncot park Private Limited — under environmental review, 700 m away
- Additional buildings at Delphi TVS Technologies Limited, Oragadam — environmental approval granted, 950 m away
- Proposed Manufacturing Unit of Synthetic Organic Chemicals – API Intermediates — cleared for impact study, 1.8 km away
- Proposed Manufacturing Unit of Synthetic Organic Chemicals – API Intermediates — cleared for impact study, 1.8 km away
- Proposed Expansion of Industrial Buildings by M/s. Doowon Automotive Systems… — initial checks, 1.9 km away
- Proposed Expansion by Chennai Radha Engineering Works Private Limited — environmental approval granted, 2.4 km away
- Proposed 1X10 MW Coal based Co-Gen Thermal Power Plant — environmental approval granted, 2.5 km away
- Proposed 1X10 MW Coal based Co-Gen Thermal Power Plant — environmental approval granted, 2.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.