What is Developing? Open the mapMap

Under environmental reviewBuildings & townships · Chengalpattu, Tamil Nadu

Proposed Expansion and Construction of Multi – storied Residential Group Development @ Mahindra World City, Paranur Village, Chengalpattu by M/s. Alliance Budget Housing India Pvt Ltd

Proposed Expansion and Construction of Multi – storied Residential Group Development @ Mahindra World City, Paranur Village, Chengalpattu by M/s. Alliance Budget Housing India Pvt Ltd is a proposed building project in Paranur, Chengalpattu, Tamil Nadu. The site covers 9.2 acres. Its stated project cost is ₹358.7 crore. As of 27 Nov 2026, its status is “Under environmental review” (since 24 Nov 2026).

See it on the live map All projects in Chengalpattu

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Expansion and Construction of Multi – storied Residential Group Development @ Mahindra World City, Paranur Village, Chengalpattu by M/s. Alliance Budget Housing India Pvt Ltd is a proposed building project in Paranur, Chengalpattu, Tamil Nadu. The site covers 9.2 acres.

Who is building it?

The applicant is Alliance Budget Housing India Private Limited.

Has it been approved?

Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.

Where is it?

In Paranur, Chengalpattu, Tamil Nadu.

How big is it?

It has a stated cost of ₹358.7 crore and a site of 9.2 acres.

When was it filed?

The application was filed on 13 Oct 2026.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Expansion and Construction of Multi – storied Residential Group Development @…

Project details

StatusUnder environmental review
Status since24 Nov 2026
Application filed13 Oct 2026
Approval soughtEnvironmental approval
Application typeExpansion
SectorBuildings & townships
ApplicantAlliance Budget Housing India Private Limited
Land area9.2 acres (3.7 ha)
Project cost₹358.7 crore
Village / localityParanur
Taluk / tehsilChengalpattu
DistrictChengalpattu
StateTamil Nadu
Location fromSite boundary on record
Our referenceWID-TN-04662

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 13 Oct 2026 (this page)Under environmental review9.2 acres₹358.7 crore
Early planning filed 27 Apr 2026Cleared for impact study9.2 acres₹358.7 crore

What the filings say

What is planned

M/s. Alliance Budget Housing India Pvt Ltd is proposing an expansion of a multi-storied residential group development within Mahindra World City. The project is situated on a total land area of 3.74 hectares (9.24 acres) at Plot No. 17-1 in Paranur Village.

The applicant previously obtained environmental clearance in February 2024 for 1,119 dwelling units across seven blocks (A to G). The current proposal seeks to expand the development by adding four additional blocks, bringing the total to 11 blocks with 2,198 dwelling units. The total built-up area after expansion is planned to be 2,34,802.20 square metres.

Building Configuration

The proposed development includes the following building structures:

The residential units will consist of 511 one-BHK units, 825 two-BHK units, and 862 three-BHK units. The estimated population for the completed project is 10,148 persons, including residents, visitors, and maintenance staff.

Layout and design

The site layout allocates approximately 50.85% of the land (19,023.69 square metres) for ground coverage. Greenbelt development will cover 15.04% (5,625.94 square metres), while roads and pavements account for 19.10%. Utilities, including a swimming pool, transformer, diesel generator (DG) sets, and an organic waste converter (OWC), occupy 8.90% of the area.

Parking is planned for 1,291 cars and 1,615 two-wheelers, distributed across basement, stilt, and surface levels. The design incorporates energy-efficient features such as solar panels covering 50% of the terrace area, natural lighting optimization, and LED lamps for common areas.

Land and surroundings

The project site is located at an elevation of 59.8 metres on plain topography. It is classified as a residential use zone within the Mahindra World City industrial park. Environmentally sensitive areas in the vicinity include the Paranur Lake (0.05 km north), Kolavai Lake (0.77 km south), and the Tirutteri Reserved Forest (0.14 km east-northeast). Several archaeological sites, including megalithic cists and cairns, are located within 1 km of the site.

Water, power and access

Water Supply

The total water requirement after expansion is estimated at 956 kilolitres per day (KLD). Fresh water (651 KLD) will be sourced from Mahindra World City (MWC). Recycled water (305 KLD) will be used for flushing and gardening. Sewage generation is estimated at 824 KLD, which will be treated at the MWC common sewage treatment plant (STP) with a capacity of 2 million gallons per day (MGD).

Power and Access

The total power requirement is 15.2 MW, to be sourced from the Tamil Nadu Generation and Distribution Corporation (TANGEDCO). Backup power will be provided by five DG sets with capacities ranging from 250 kVA to 625 kVA. The site is accessible via the Paranur Railway Station Road (0.24 km west) and is near the Chennai-Salem Expressway (NH 179B).

Environmental safeguards

Solid waste management plans include an on-site organic waste converter to treat 2,275 kg/day of biodegradable waste, which will be used as manure. Non-biodegradable waste (3,412 kg/day) will be sold to authorized recyclers. E-waste and hazardous waste, such as spent oil from DG sets, will be handled by authorized vendors. Rainwater harvesting will be implemented through 42 recharge pits and a collection sump for reuse in domestic purposes.

Timeline

The applicant's project report estimates a construction period of approximately three to four years. As of late 2026, construction was reported in progress for the combined basement, stilt floors, and portions of Blocks B and C, totaling 368 dwelling units.

Alliance Budget Housing Expansion and Construction of Multi – Storied Residential Group Development @ Mahindra World City, Paranur Village, Chengalpattu site plan and layout

3 drawings from the project's filings. Sign in free to see them.

Alliance Budget Housing Expansion and Construction of Multi – Storied Residential Group Development @ Mahindra World City, Paranur Village, Chengalpattu: Site cum first floor plan: blocks, roads, and internal layout (preview)🔒 Sign in free to see it
Site cum first floor plan: blocks, roads, and internal layout
Alliance Budget Housing Expansion and Construction of Multi – Storied Residential Group Development @ Mahindra World City, Paranur Village, Chengalpattu: Location map showing project site and surrounding connectivity (preview)🔒 Sign in free to see it
Location map showing project site and surrounding connectivity
Alliance Budget Housing Expansion and Construction of Multi – Storied Residential Group Development @ Mahindra World City, Paranur Village, Chengalpattu: Water balance chart for the project after expansion (preview)🔒 Sign in free to see it
Water balance chart for the project after expansion

In context

302 applications in Chengalpattu since January 2022 are in the same category (Buildings & townships): 206 approved, 67 filed or under review, and 29 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 9.2 acres, this one is smaller than 56% of them.

40 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Paranur, Chengalpattu, Tamil Nadu. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Alliance Budget Housing India Private Limited in Chengalpattu

All 4 Alliance Budget Housing projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.